Similar Projects
Last Updated | 02/14/2023 07:09 AM |
Project Title | Barrow Arts and Sciences Academy (BASA) Phase II |
Physical Address | View project details and contacts |
City, State (County) | Winder, GA 30680 (Barrow County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | All Sub-Bids Received, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $8,000,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Barrow Arts and Sciences Academy Phase II Project Proposals must be submitted on the Construction Manager's Scope and Proposal Form along with Bond if required. Proposals must be submitted per the requirements of the Instructions to Proposers and the appropriate Proposal Package. Mail or hand deliver your sealed Proposal to the address designated above for receipt of Proposals, to the attention of Grahl Construction. Proposals received after the time is called will not be accepted. Proposers may also submit via email to "bids@grahlconstruction.com". Emailed Proposals must have the word "Proposal" and the "Project Name" in the subject bar No determination will be made as to the most responsive Proposal until the Construction Manager and the Owner have conducted a thorough evaluation. Additional information may be requested of responsive Proposers and may be used to help select the most qualified. The Construction Manager and Owner reserve the right to accept or reject any or all Proposals and to waive technicalities. The following Proposal Packages are available - Coordinate with Instructions to Proposers: PP 03 Concrete Foundations & Slabs PP 04 Masonry PP 05A Structural & Misc. Steel PP 05B Glass & Stainless-Steel Railings PP 05C Aluminum Door Canopies PP 07 Roofing PP 08A Doors/Frames/Hardware PP 08B Aluminum Storefront/Curtain Wall/Glazing/Sliding Glass Window PP 08C Overhead Coiling Doors/Security Grilles PP 09A CFMF/LG Framing/Drywall/ACT/EFIS PP 09B Hard Tile Flooring PP 09C Resilient/Carpet/Wood PP 09D Painting PP 09E Seamless Epoxy Flooring PP 10A Signage PP 10B Fire Extinguishers & Cabinets/Toilet Accessories/Visual Display/Curtin Tracks PP 10C Lockers PP 11 Science Casework PP 12 Laminate Clad Casework PP 14 Elevator PP 15A Plumbing PP 15B Fire Sprinkler System PP 15C HVAC System PP 16 Electrical & Low Voltage PP 17 Intercom & Camera System PP 18 Flatwork/Curbing/Asphalt Paving List of Proposal Documents: o Invitation to Proposal (2 pages). o Instructions to Proposers entitled "BASA II" prepared by the Construction Manager. o Scope & Proposal Form entitled "BASA II" prepared by the Construction Manager. o Scope of Work Proposal Packages, as listed above, prepared by the Construction Manager. o Plans entitled "BASA II" prepared by Cunningham Forehand Matthews & Moore Architects, Inc. o Specifications entitled "BASA II" prepared by Cunningham Forehand Matthews & Moore Architects, Inc. o AIA(R) Document A201(TM)-2007 General Conditions of the Contract for Construction, incorporated herein by reference. o All addendum or clarifications issued prior to the date and time set for opening of Proposals |
||||||||||||||||||||||||||||||||||||||
Details | 114,049 SF.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |