Last Updated 02/24/2020 03:38 PM
Project Title

Linwood Water Reclamation Facility Diffuser

Physical Address View project details and contacts
City, State (County) Gainesville, GA 30501   (Hall County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all products and performing all labor necessary for the construction of a new effluent pipe and diffuser into Lake Lanier. This will include approximately 653 LF of a combination of 36” inch HDPE and ductile iron pipe. The pipe will be laid below grade down to elevation 1050 where it will then transition to placement on the lake bottom and connect to the HDPE diffuser pipe placed along the lake bottom, approximately 70 feet below the water surface. The diffuser pipe is 360 feet long with 35 4-inch diameter ports extending outward into the lake at various angles. The diffuser pipe will be anchored to the lake bottom using concrete pipe collars at intervals to support the pipe and provide the necessary ballast to prevent flotation. The existing effluent pipe and diffuser must remain in operation until the new effluent pipe and diffuser are in service: after which the existing effluent pipe and diffuser will be abandoned in place

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents