Similar Projects
Pad Mounted Transformers (Re Manufactured Only)
Term Contract
Post-Bid

Pad Mounted Transformers (Re Manufactured Only)
Term Contract
Post-Bid

Tica Upgrade Electrical, Qtr 8
Results
American Fork, UT 84003

Licensed Plumbers to Install Gas or Electric Water Heaters
Results
Price, UT

Dark Sky Standards for Sandy City Street Lights
Post-Bid
Sandy, UT

Electric Vehicle Charging Station Installations
Results
Less than $80,000 est. value
Salt Lake City, UT

Variable Frequency Drive Parts and Service
Term Contract
Post-Bid
Less than $75,000 est. value
UT

Fine Arts Theatrical Lighting
Term Contract
Results
Orem, UT

On-Call Electrician Services
Post-Bid
$25,000 to $500,000 est. value
Salt Lake City, UT

Fine Arts Theatrical
Results
Orem, UT

Replace Building 40 Transformer
Post-Bid
$100,000 to $250,000 est. value
Salt Lake City, UT 84116

DFCM Construction Pre-Qualified Electrical Contractors UVU Concourse Lighting Upgrade
Results
Less than $205,000 est. value
Orem, UT 84058

DODEA Americas UPS Upgrade and Warranty Services
Post-Bid

Fine Arts Theatrical Lighting 2
Results
Orem, UT

UPS Replacement Batteries
Post-Bid
Salt Lake City, UT

Reported 12/08/2018 12:00 AM
Project Title

FY19 2MW Photovoltaic Repair at Tooele, UT

Physical Address View project details and contacts
City, State (County) Tooele, UT   (Tooele County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description This upcoming design-build Request for Proposal (RFP) provides for the design and construction of Solar Electricity Generation via the installation of a two Megawatt (2 MW) solar array photovoltaic system whose electrical generation shall be used to offset the installation's electrical energy consumption. Contractor shall either use the design elements provided or portions thereof, or he shall himself design all elements the PV array. Either way the contractor chooses to move forward, the design will be the contractor's responsibility to assure all applicable codes and contract requirements are met and that the design is finalized for construction. All requirements on the drawings shall be verified by the contractor, prior to bid, and the full design is the responsibility of the contractor. The selected photovoltaic system shall incorporate state of the art high efficiency photovoltaic modules manufactured in the USA and be UL-listed. The modules shall be mounted to ground mounted racks. Before any work is to proceed, a survey shall be conducted to verify existing conditions within the proposed area. Two vented metal buildings on concrete pads shall be provided for inverters and related electrical equipment. This will provide shading and dust protection for the inverters. The building concrete pads shall be a minimum of 4,000 psi concrete. Electrical equipment such as inverters, transformer, and related switchgear, controls, metering, etc. shall be sized at 2 MW system total.
Details
Division 26 - Electrical.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents