Similar Projects
Reported | 12/08/2018 12:00 AM |
Project Title | FY19 2MW Photovoltaic Repair at Tooele, UT |
Physical Address | View project details and contacts |
City, State (County) | Tooele, UT (Tooele County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Design-Build. Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This upcoming design-build Request for Proposal (RFP) provides for the design and construction of Solar Electricity Generation via the installation of a two Megawatt (2 MW) solar array photovoltaic system whose electrical generation shall be used to offset the installation's electrical energy consumption. Contractor shall either use the design elements provided or portions thereof, or he shall himself design all elements the PV array. Either way the contractor chooses to move forward, the design will be the contractor's responsibility to assure all applicable codes and contract requirements are met and that the design is finalized for construction. All requirements on the drawings shall be verified by the contractor, prior to bid, and the full design is the responsibility of the contractor. The selected photovoltaic system shall incorporate state of the art high efficiency photovoltaic modules manufactured in the USA and be UL-listed. The modules shall be mounted to ground mounted racks. Before any work is to proceed, a survey shall be conducted to verify existing conditions within the proposed area. Two vented metal buildings on concrete pads shall be provided for inverters and related electrical equipment. This will provide shading and dust protection for the inverters. The building concrete pads shall be a minimum of 4,000 psi concrete. Electrical equipment such as inverters, transformer, and related switchgear, controls, metering, etc. shall be sized at 2 MW system total. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |