Similar Projects
New Fire Department Headquarters
New Construction
Conception
McKinney, TX

Fire Station #6
New Construction
Conception
Mansfield, TX

Fire Station 2
New Construction
Design
$4,500,000 est. value
Humble, TX 77338

New Law Enforcement Center
Addition
Design
Mansfield, TX 76063

New Public Safety Training Center
New Construction
Post-Bid
Less than $7,000,000 est. value
Texas City, TX

City of Duncanville Fire Station #1
New Construction - 15,500 SF
Post-Bid
Duncanville, TX 75116

Fort Bend County Emergency Services District No. 6 Fire Station No. 1
New Construction - 7,590 SF
Results
Richmond, TX 77469

Temporary Buildings and Dome Structures
New Construction - 7,700 SF
Results
$145,196 est. value
Dallas, TX 75230

Police Headquarters and Fire Station #2 and Administration Buildings
New Construction - 73,273 SF
Construction
Less than $19,700,000 est. value
Huntsville, TX 77340

New EMS Station 97
New Construction - 4,000 SF
Construction
Humble, TX 77346

Fire Station #7
New Construction - 14,300 SF
Pending Verification
Pearland, TX

Police Training Center
Renovation - 1,700 SF
Pending Verification
Pearland, TX

Fire Station #7
New Construction
Conception
$7,100,000 est. value
College Station, TX

Police Weapons Range New Classroom Building
New Construction
Design
$630,000 est. value
Waco, TX 76708

Fire Station No. 5
Post-Bid
TX

Reported 06/15/2022 12:00 AM
Project Title

City Of Celina Fire Station 3

Physical Address View project details and contacts
City, State (County) Aubrey, TX 76227   (Denton County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids. Owner to Subcontract.
Project Status Sub-Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $12,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Celina Fire Station No. 3 is a new one story building of approximately 23,324 gross square feet located at 4400 f.m. 1385 in Celina, Texas that is intended to house the City of Celina Fire Department. Situated at the intersection of Ballenger Road and f.m. 1385, the site is mostly flat and will accommodate parking for both visitors and staff, as well as apparatus entry and exit. The building includes a five lane apparatus bay, living, dining, and sleeping quarters for twelve fire fighters, training spaces, and locker rooms. The apparatus bay is primarily stone veneer on 8" cmu backup wall, and the remainder of the facility is primarily stone veneer on steel stud backup wall. The project also includes a storm shelter that will be constructed of stone veneer on 12" cmu backup wall at the men's locker room.

Details

Fire/Police Station, 1 Story Above Grade, 23,324 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents