Similar Projects
Lynn Lane Trunk Sewer Replace - S.1609 - Construction
Infrastructure
Conception
$1,874,896 est. value
Broken Arrow, OK 74012

Haikey Creek Trunk Sewer Phase 1 - Construction - HC21010 - City of Broken Arrow
Infrastructure
Conception
$4,090,075 est. value
Broken Arrow, OK 74011

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 CJ est. value
Tulsa, OK 74110

I-44 - Utilities
Infrastructure
Design
$2,013,883 CJ est. value
Tulsa, OK 74145

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

Sheridan Road Booster Pump Station
Infrastructure
Post-Bid
Collinsville, OK 74021

Sidewalk and Curb Ramp Construction for CBDG / HUD Grant
Infrastructure
Results
$235,173 CJ est. value
Tulsa, OK 74103

CDBG Water Line Replacement
Infrastructure
Results
Sand Springs, OK 74063

Jenks Speech Therapy
New Construction, Infrastructure - 6,080 SF
Construction
$1,300,000 CJ est. value
Jenks, OK 74037

Uncle Julio's / Tulsa
New Construction, Infrastructure - 7,693 SF
Construction
$1,752,382 CJ est. value
Tulsa, OK 74133

WeConnect Office Expansion
Demolition, Renovation, Infrastructure - 866 SF
Pending Verification
$40,000 CJ est. value
Tulsa, OK 74137

The Enclave at Southern Trails
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Broken Arrow, OK 74011

Vandever East 6th Addition - City of Broken Arrow
Alteration
Conception
$485,000 est. value
Broken Arrow, OK

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Last Updated 02/13/2023 10:23 AM
Project Title

Jones Douglas 91-North Relief

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74103   (Tulsa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $6,904,280 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 01, 2023, this project has not yet been awarded. A timeline for award is after 3 weeks. Each bid Proposal shall be completed electronically on the electronic media provided, then printed, signed, and submitted along with the electronic media and the complete bound copy of the contract documents. In the event of a discrepancy between the pricing on the electronic media and hard copy of a Proposal, the hard copy pricing will govern. If electronic media is not provided and the bid Proposal is manual, the bid Proposal shall be submitted in ink. The written words shall govern over the figures if there is a difference between the two. No alterations, additions, or erasures shall be made on the Proposal. Erroneous entries shall be lined out, initialed by the bidder, and the correct entry inserted. The unit price bid must cover all expense for furnishing the labor, materials, tools, equipment, and apparatus of every description to construct, erect, and furnish all work required by and in conformance with the Drawings and Specifications. Each bid shall be enclosed in a sealed envelope addressed to the Tulsa Metropolitan Utility Authority, c/o City of Tulsa, 175 E. 2nd Street, Room 260, City Hall, Tulsa, Oklahoma identified on the outside with the words: Drawings, specifications and contract documents for construction of said public improvements of the said project have been adopted by the Mayor of said City. A Certified or Cashiers Check or Bidders Surety Bond, in the sum of 5% of the amount of the bid will be required from each bidder to be retained as liquidated damages in the event the successful bidder fails, neglects or refuses to enter into said contract for the construction of said public improvements for said project and furnish the necessary bonds within thirty days from and after the date the award is made. The Performance, Statutory, and Maintenance bonds shall be for one hundred percent (100%) of the contract price. Bids received more than ninety-six (96) hours, before the time set for opening bids, excluding Saturdays, Sundays, and Holidays, as well as bids received after the time set for opening bids, will not be considered and will be returned unopened.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents