Similar Projects
Professional Locksmith Services
Term Contract
Sub-Bidding
Greeley, CO 80631

Northern Treatment Plant Landscaping Services
Term Contract
Sub-Bidding
Brighton, CO 80603

Mosquito Control Services
Term Contract
Post-Bid

Crushed Concrete and/or Recycled Asphalt Product (RAP)
Term Contract
Post-Bid
Greeley, CO 80631

2022 Crack Sealant Services
Infrastructure
Results
$297,370 CJ est. value
Erie, CO 80516

2023 Turf Maintenance at Greeley West High School
Term Contract
Sub-Bidding
Greeley, CO 80631

Job Order Contractor - Mechanical, Electrical, Plumbing (MEP)
Term Contract
Post-Bid
Erie, CO 80516

Custodial Services - Downtown
Term Contract
Sub-Bidding
Greeley, CO 80631

Town of Erie Job Order Contractor - Horizontal/Civil
Term Contract
Post-Bid
Erie, CO 80516

HVAC Belts
Term Contract
Sub-Bidding
Greeley, CO 80631

Job Order Contractor - General Contracting
Term Contract
Post-Bid
Erie, CO 80516

Exclusive Residential Refuse, Recyclables and Yard Waste Collection Service
Term Contract
Post-Bid
Hudson, CO 80642

Grader Shed Fuel Tank
Term Contract
Post-Bid
Ault, CO 80610

Municipal Refuse Collection Services
Term Contract
Post-Bid
Milliken, CO 80543

Districtwide Convertible Bench Tables
Term Contract
Post-Bid
Frederick, CO 80530

Last Updated 03/03/2023 07:32 PM
Project Title

2023 Concrete and Alleyway Maintenance Program

Physical Address View project details and contacts
City, State (County) Frederick, CO 80530   (Weld County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of: Furnish and install all labor and materials for site activities including; 1) Staging and mobilization; 2) Surveying and design; 3) Traffic control; 4) Potholing for utilities in work area; 5) Coordination with utility, trash service and material testing companies as well as notification of affected parties; 6) Demolition and removal of existing concrete curb and gutter, sidewalk, crosspans, driveway ramps or other areas determined to be in need of repair; 7) Earthwork including excavation, import, haul, placing, and compaction of materials as necessary to construct the project; 8) Installation of concrete alleyway; 9) Replacement of all concrete curb and gutter, sidewalk, crosspans, driveway ramps or other areas determined to be in need of repair; 10) Miscellaneous appurtenances as prescribed in special provisions. Specifically, including all labor and materials for construction of the project as shown on the design drawings, final grading and seeding of disturbed areas, and miscellaneous items necessary for a complete and functional project. For additional information on this bid all questions should be directed to Jason Berg in the Engineering Department at jberg@frederickco.gov or (720) 382-5601.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents