Similar Projects
Toquer Ridge
New Construction - 715,000 SF
Conception
$10,000,000 CJ est. value
Toquerville, UT 84774

Corderro Development
New Construction
Design
Hurricane, UT

Pecan Valley Phase 4
New Construction
Design
Hurricane, UT 84737

Pecan Valley Phase 3
New Construction
Construction
Hurricane, UT 84737

Corderro Development Phase 1
New Construction
Construction
Hurricane, UT 84737

Falcon Ridge Phase 4
New Construction
Pending Verification
Hurricane, UT

Gooseberry & Little Creek Cabins
New Construction
Pending Verification
Rockville, UT

The Estates at Sand Hollow
New Construction
Design
Hurricane, UT 84737

Sand Hollow Mesa
New Construction
Pending Verification
Hurricane, UT

Mojave Flats
New Construction
Pending Verification
Ivins, UT 84738

Brio - Phase 2C
New Construction
Pending Verification
Washington, UT 84780

Riverbend at Sunrise Valley - Phase 1
New Construction
Pending Verification
Washington, UT 84780

Washington Vista - Phase 3A
New Construction
Pending Verification
Washington, UT 84780

Cottonwood Hollow
New Construction
Pending Verification
La Verkin, UT 84745

Crimson Estates
New Construction
Pending Verification
Saint George, UT 84790

Reported 05/21/2021 08:54 AM
Project Title

The Hills at Santa Clara Phase 3

Physical Address View project details and contacts
City, State (County) Santa Clara, UT 84765   (Washington County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method
Project Status Obtained from a Public Office
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

24 Single-Family Homes, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents