Similar Projects
Last Updated | 10/27/2022 03:06 PM |
Project Title | McNamara Terminal Domestic Arrivals Level Bird Remediation |
Physical Address | View project details and contacts |
City, State (County) | Detroit, MI 48242 (Wayne County) |
Category(s) | Single Trades |
Sub-Category(s) | Finishes/Interior |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $50,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Soliciting bids from general contractors, construction managers and other businesses that meet the qualifications set forth herein for the installation of bird netting and cleaning/removal of existing bird droppings underneath the bridge structure at the McNamara Terminal Arrivals Level curbside and adjacent roadway at Detroit Metropolitan Wayne County Airport. PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND: The Contractor shall furnish an AIA 311 Performance Bond and an AIA 311 Labor and Material Payment Bond (AIA 312 forms will not be accepted). Both Bonds shall be in an amount equal to 100% of the Contract Sum and shall comply with the requirements set forth in Article 10 of the General Terms and Conditions. PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND: The Contractor shall furnish an AIA 311 Performance Bond and an AIA 311 Labor and Material Payment Bond (AIA 312 forms will not be accepted). Both Bonds shall be in an amount equal to 100% of the Contract Sum and shall comply with the requirements set forth in Article 10 of the General Terms and Conditions. Substantial Completion of Construction - shall be achieved within 60 calendar days of the NTP for construction. The number of days that vehicle lanes are barricaded and work activity at the site is occurring shall not exceed 30 days (an average of 10 days for each of the three phase shown on the Drawings. Once Substantial Completion of the construction work has been achieved, the Contractor shall remove all equipment and temporary traffic control devices from the site. Final Completion - Construction work including all restoration, cleanup, completion of punch list and removal of temporary traffic control and safety devices shall be no later than 30 calendar days after the Substantial Completion date. Construction will not be considered to be complete unless all project construction tasks are completed. Final Completion and submittal of Final Contractor's Pay Application to the Airport Authority shall be completed no later than 60 calendar days after Substantial Completion date. All questions regarding this RFB must be submitted to the Procurement Contact at the above number and email address. Contact concerning this RFB with any other employee, officer or Board Member of the Airport Authority is not permitted during the solicitation process. Pre-Bid Question Deadline August 16, 2022 2:00 PM Eastern Time CANCELLATION OF RFB The Airport Authority reserves the right to cancel this solicitation, in whole or in part, as well as reject any or all bids, or to accept or reject any bid in part, and to waive any minor informality or irregularity in bids received if it is determined by the Chief Executive Officer (CEO) or his designee that the best interest of the Airport Authority will be served by so doing. If the solicitation is cancelled or all bids are rejected by the Airport Authority. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |