Similar Projects
Advanced Technology Precast Concrete Hollow Core Planks
Alteration
Post-Bid
Grayslake, IL 60030

2022 Concrete Flatwork
Alteration
Results
Lake Zurich, IL

2022 Stamped Concrete Replacement
Alteration
Results
Grayslake, IL

Balzer Park Poured In Place Playground Surface
Renovation, Infrastructure
Results
Lincolnshire, IL 60069

Basketball and Tennis Court Surface Repair and Color Coating
Infrastructure
Results
$127,400 CJ est. value
Gurnee, IL 60031

Fire Station #1 Concrete Pad Replacement
Renovation, Alteration
Results
$20,000 est. value
Libertyville, IL 60048

Systemwide Pavement Marking
Infrastructure
Results
$2,994,666 CJ est. value
Chicago, IL 60652

Concrete Replacement Station 20
Alteration
Results
$75,000 est. value
Deerfield, IL 60015

2023 Renovations at Antioch Upper Grade School
Renovation
Post-Bid
$3,000,000 CJ est. value
Antioch, IL 60002

Lake County Tech Campus - 2023 Renovations
Renovation
Post-Bid
$250,000 CJ est. value
Grayslake, IL 60030

2023 Sidewalk Improvements Project
Infrastructure
Results
$243,701 CJ est. value
Buffalo Grove, IL 60089

2023 Unit Price Concrete Materials Purchase
Term Contract
Post-Bid
Highland Park, IL 60035

Park City Flood Mitigation Storm Sewer Project
Infrastructure
Results
$2,061,658 CJ est. value
Park City, IL 60085

Roadway Reconstruction and Realignment; Building Removal and Site Clearing; Installation of a New Traffic Signal; Drainage Improvement; Aesthetic Landscaping to IL 83
Infrastructure
Results
$15,926,091 CJ est. value
Grayslake, IL 60030

Briergate Business District Improvements
Infrastructure
Results
$1,581,818 CJ est. value
Highland Park, IL 60035

Last Updated 05/16/2023 10:32 AM
Project Title

2023 Road Improvement, Sidewalk and Drainage Project

Physical Address View project details and contacts
City, State (County) Green Oaks, IL 60048   (Lake County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $697,410 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All work shall be in accordance with the Contract Documents including plans and specifications. For a non-refundable fee of $25.00, bid documents may be obtained on our website: www.clarkdietz.com. Access document by clicking on the "Bidding Documents" icon located at the top of the page, and then select "browse projects" to find the 2023 Road Improvement, Sidewalk, & Drainage Project bid documents. Contact Clark Dietz, Inc. at 262-657-1550 with any questions regarding the registration or download process. Contract Documents will not be available at the Village Hall. Bids will be opened and read aloud publicly after 11:01 a.m. on May 12th, 2023 at the Village Hall. The as-read bid tabulation will be published through QuestCDN after the bids have been opened. Each bid and proposal must be accompanied by a certified check or cashier's check or bid bond payable to the Village of Green Oaks, in an amount not less than ten percent (10%) of the maximum bid price as a guarantee that if the bid is accepted, the bidder will execute and file the proposed contract within fifteen (15) days after the award of the contract. In case the successful bidder shall fail to execute such contract and bond, the amount of the check or bid bond shall be forfeited to the Village as liquidated damages. No bid shall be withdrawn after the opening of bids for a period of sixty (60) days after the scheduled time of closing bids. Bids and proposals must be sealed and addressed to the Village of Green Oaks and there shall appear on the envelope of such bid and proposal the name and address of the bidder and the purpose for which the proposal is intended. The Village of Green Oaks reserves the right to reject any or all proposals, to waive any defects or informalities in bids received and to accept the bid most advantageous to the Village. All work performed under this contract shall be in accordance with the laws of the State of Illinois, including but not limited to the Illinois Prevailing Wage Act and the Illinois Employee Classification Act. This project is subject to the requirements of the wage determination of the Secretary of Labor. The Village of Green Oaks, in accordance with the laws of the State of Illinois, hereby notifies all bidders that it will affirmatively insure that the contract entered into pursuant to this advertisement will be awarded to the lowest responsible bidder without discrimination on grounds of race, color, or national origin. Direct questions in writing to Ben Metzler at the office of the Engineer; email ben.metzler@clarkdietz.com. Written questions will be taken up until three days prior to the Bid Opening, at which time no more questions will be answered.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents