Similar Projects
2021 High Density Mineral Bond
Bidding
South Jordan, UT 84095

SR-71 Hillcrest High Drive to 3300 South Preservation High Volume
Bidding
$1,500,000 to $3,000,000 est. value
Midvale, UT 84047

US-89; I-215 to 4300 South Preservation High Volume
Post-Bid
$3,000,000 to $4,000,000 est. value
UT

3200 West; 10431 South to 10600 South Reconstruct Widening
Post-Bid
$500,000 to $1,500,000 est. value
UT

Redwood Road 4100 South to 5400 South
Results

2019 Roadway Improvement Projects
Results
Midvale, UT

2021 Pavement Maintenance Project
Bidding
Draper, UT

Jupiter and Brockbank Roadway Improvements
Post-Bid
Millcreek, UT 84106

1700 South, 600 East Bike Lane, School Crosswalk Enhancements
Results
Less than $84,895 est. value
Salt Lake City, UT 84111

13200 South Pavement Reconstruction
Bidding
Less than $200,000 est. value
Draper, UT

Parleys Way Crosswalk Enhancements and Pedestrian Safety Improvements
Post-Bid
Salt Lake City, UT 84114

2019 Fall Crack Seal Project
Results
Sandy, UT 84070

2600 S. Storm Drain, Road and Sidewalk Improvements
Bidding
$725,000 to $1,400,000 est. value
Salt Lake City, UT

Lone Peak Pkwy 12200 S To 11400 S Widening Project
Post-Bid
Draper, UT 84020

SR-186;1300 E to 2100 E and Stringham Ave to I-215 Preservation High Volume
Results
$1,500,000 to $3,000,000 est. value
UT

Last Updated 02/14/2020 01:45 PM
Project Title

Local Streets Reconstruction 2020 1 and 1900 East Reconstruction

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84114   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The locations of the work are: Ramona Avenue from 900 East to 1000 East, Coatsville Avenue from 800 East to 900 East, Elizabeth Street from Crystal Avenue to Whitlock Avenue, Kensington Avenue from 1400 East to 1500 East, Parkway Avenue from Elizabeth Street to Highland Drive, Zenith Avenue from 800 East to 900 East and 1900 East from Wilmington Avenue to Parley’s Canyon Boulevard, in Salt Lake City. B. The work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to Street improvements, (asphalt pavement, reclaimed aggregate with cement stabilizer, curb and gutter repair, ADA ramps and concrete flatwork), storm drain work, water work and sanitary sewer work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents