Similar Projects
Turfway Park - Newport Horse Racing and Gaming Center
New Construction - 17,000 SF
Construction
$104,000,000 est. value
Florence, KY 41042

Florence Y'alls Stadium Exterior Repairs
Renovation
Results
Florence, KY 41042

Sports Complex: Light Pole Installation Project
Infrastructure
Post-Bid
$50,000 CJ est. value
Catlettsburg, KY 41129

Revolutionary Racing - Phase 1
New Construction, Infrastructure
Pending Verification
$55,000,000 CJ est. value
Ashland, KY 41101

Dugout Extensions
Renovation
Results
Burkesville, KY

RFQ Design - Professional Services for Design of an Indoor SportsPlex
New Construction, Infrastructure
Post-Bid
$60,000,000 CJ est. value
Owensboro, KY 42303

Outdoor Stadium - Painting/Miscellaneous Upgrades
Renovation, Alteration
Results
$118,500 est. value
Lexington, KY 40511

Lexington Pro Soccer Stadium
New Construction - 45,000 SF
Design
$151,000,000 CJ est. value
Lexington, KY 40508

War Memorial Stadium New Restrooms and Concessions
New Construction - 960 SF
Results
$150,000 est. value
Mayfield, KY 42066

Design Build - Cardinal Stadium Club Renovation
Renovation
Post-Bid
Louisville, KY

Hope & Haven Arena
New Construction, Infrastructure - 8,400 SF
Pending Verification
$2,000,000 CJ est. value
Louisville, KY 40218

Allen Field Stadium Improvements
Renovation
Post-Bid
$200,000 est. value
Morehead, KY 40351

Corbin High School Football Stadium Renovation
New Construction, Infrastructure
Bidding
$7,000,000 CJ est. value
Corbin, KY 40701

Last Updated 10/06/2022 01:11 PM
Project Title

Renovate Cardinal Football Stadium - University of Louisville

Physical Address View project details and contacts
City, State (County) Louisville, KY 40209   (Jefferson County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined This project is included in the city's 2022-2028 Capital Improvement Plan (CIP). As of October 6, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents