Similar Projects
North State Street Water Main Replacement
Infrastructure
Bidding
$200,000 est. value
Dover, DE 19906

Construction of the 7th Street Water Main Replacement
Infrastructure
Bidding
$300,000 est. value
Laurel, DE 19956

Marshalton Heights Water Main Renewal
Renovation
Post-Bid
Marshallton, DE

Heritage Elementary School Dehumidifier Installation
Post-Bid
Wilmington, DE 19808

Greater Ellendale Water District
Results
Georgetown, DE

2020 Water Infrastructure Improvement
Results
Magnolia, DE

Water System Replacement and Upgrades
Infrastructure
Post-Bid
Frederica, DE

Water System Improvements
Results
Milton, DE 19968

Morris Community Corrections Center - Sanitary Line Replacement
Infrastructure
Post-Bid
Dover, DE 19901

G V Kirk Middle School Water Fountain Replacements
Results
Newark, DE 19713

Water Meter Replacement Project
Infrastructure
Post-Bid
Rehoboth Beach, DE

Western Sussex Business Campus Opportunity Drive
Results
Seaford, DE

Stahl Water Main Renewal
Term Contract
Post-Bid
Newark, DE

Water Valve Operation, Improvement, and Information Management Program
Results
Newark, DE

Hot Tapping and Line Stopping Work
Infrastructure
Post-Bid
$600,000 est. value
New Castle, DE

Reported 06/18/2022 12:00 AM
Project Title

AFICA EAST AFCEC DB Advanced Meter Reading System (AMRS) Metering Implementation Dover AFB

Physical Address View project details and contacts
City, State (County) Dover, DE 19902   (Kent County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected February 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall purchase and install 88 new AMRS compliant electric meters and CTs (Table DEM1). The Contractor shall furnish all materials, equipment, labor and miscellaneous items necessary to install the new meters. The Contractor shall install 88 new communication drops, LAN receptacle plug-ins, and associated equipment to establish remote communications to the patch panel associated with the nearest Air Force network switch or other noted location. Assume all communication runs are <328 feet, to include patch cables, unless otherwise noted. Fiber communication runs are annotated in Table DEM1. All voltage and amperage noted in Table DEM1 is the responsibility of the contractor to field verify prior to design. $1-5 Million.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents