Similar Projects
Emerson Hills Apartments
New Construction
Conception
Kannapolis, NC 28083

The Woodlands At Echo Farms Tract 3C
New Construction - 113,007 SF
Design
$10,000,000 CJ est. value
Wilmington, NC 28412

Crabtree North Apartments
New Construction - 290,003 SF
Design
$10,000,000 CJ est. value
Raleigh, NC 27612

Horton Park Pool Improvements - Bathhouse Renovations
Renovation, Infrastructure
Bidding
$500,000 est. value
Sanford, NC 27330

Horton Park Pool Improvements
Renovation, Infrastructure
Bidding
$500,000 est. value
Sanford, NC 27330

Northlake Centre Apartments
New Construction
Sub-Bidding
Charlotte, NC 28216

Prosperity Village Mixed Use Development
New Construction - 150,900 SF
Sub-Bidding
$10,000,000 CJ est. value
Charlotte, NC 28269

Kingsley Park
New Construction
Post-Bid
Fayetteville, NC

Pool Repair Contractors
Post-Bid
Kinston, NC 28501

Malvern Hills and Walton Street Pool Repairs and Maintenance
Results
Asheville, NC 28802

Pool Resurfacing
Results
Statesville, NC 28677

Pier 33
New Construction - 510,113 SF
Construction
$65,000,000 est. value
Wilmington, NC 28401

Trinity Landing Phase I & Phase II
New Construction - 398,219 SF
Construction
$94,000,000 est. value
Wilmington, NC 28409

Harrahs Cherokee Valley River Casino
Addition, Alteration
Pending Verification
$275,000,000 est. value
Murphy, NC 28906

Crescent Hill Apartments
New Construction
Pending Verification
Arden, NC 28704

Reported 01/06/2022 12:00 AM
Project Title

Washington Terrace Pool Renovation

Physical Address View project details and contacts
City, State (County) High Point, NC 27260   (Guilford County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Repair and resurface the main pool and the wading/kiddie pool at the Washington Terrace Pool facility. The main pool is approximately 4,627 square feet with a max depth of 4.6 feet. The main pool holds approximately 123,000 gallons of water. The wading/kiddie pool is approximately 450 square feet with shallow water only. The wading/kiddie pool holds approximately 3,000 gallons of water.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents