Similar Projects
Albina Sports Complex
New Construction
Conception
Portland, OR

Indoor Practice Facility
New Construction - 170,000 SF
Conception
Eugene, OR 97401

New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Lookout Point Powerhouse Heat Pump Ventilation
Alteration
Design
$250,000 to $500,000 est. value
Lowell, OR 97452

Oregon School for the Deaf, ADA Restroom Remodel
Build-out - 338 SF
Bidding
$800,000 CJ est. value
Salem, OR 97301

South Wasco County School District K-8 Gymnasium
Renovation
Bidding
$200,000 CJ est. value
Maupin, OR 97037

Central Distribution Center (CDC) HVAC Upgrades
Renovation
Sub-Bidding
$350,000 CJ est. value
Salem, OR 97301

Oregon State Penitentiary - Johnstone Boiler
Term Contract
Sub-Bidding
Salem, OR 97310

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Filters, Installation and Coil Cleaning Services
Alteration
Results
$245,000 est. value
Hillsboro, OR

Pioneer Hall AC Replacement
Alteration
Results
$251,293 est. value
Bend, OR 97703

D-Bat Interior Tenant Improvement
Renovation - 21,440 SF
Construction
Tigard, OR 97223

NW Fencing Interior Improvements
Renovation - 17,962 SF
Construction
Tigard, OR 97223

Indoor Practice Facility
New Construction - 170,000 SF
Conception
Eugene, OR

Last Updated 08/02/2022 10:02 AM
Project Title

Mcloughlin High School Gym HVAC Renovation

Physical Address View project details and contacts
City, State (County) Milton Freewater, OR 97862   (Umatilla County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Athletic Facility, HVAC
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Firm Bid quotes for the McLoughlin High School Gym HVAC Renovation project are requested. The owner is requesting a single, all-inclusive bid. Bidder is responsible for the following under this work: Mechanical Electrical Controls Formal pre-qualifications are not required or desired. No Bidder may withdraw their Bid within 30 days after the hour set for opening. The Owner will have the right to waive any formalities and to reject any and all Bids. No Bid will be considered without a statement by the Bidder, as a part of the Bid, that the provisions required by ORS 279.300, General Policies and ORS279.800, Prevailing Wage Rates shall be included in this Contract. A Bid Bond or certified check shall be executed in favor of Milton-Freewater Unified School District 7, and an amount of not less than 10 percent of the total basic Bid sum will be required.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents