Similar Projects
Snow Removal and Deicing for MnDOT Fort Snelling
Term Contract
Bidding
Saint Paul, MN 55111

Recycling and Solid Waste Removal Services
Term Contract
Bidding
Duluth, Minneapolis, MN 55812

Contracted Sidewalk Snow Removal Services
Term Contract
Post-Bid
Fergus Falls, MN 56537

FY21 Duluth Refuse
Post-Bid
Duluth, MN

Crushing, Hauling, and Placement of Aggregate Surfacing
Results
MN

Chloride Application
Results
MN

Recycling, Processing and Management of Scrap Metal
Term Contract
Bidding
Park Rapids, MN

Debris Removal - 2941 Chicago Avenue
Post-Bid
Minneapolis, MN 55407

2021 Gravel Hauling
Results
MN

DNR2 Goosberry Garbage and Recycling
Term Contract
Post-Bid
Two Harbors, MN 55616

Waste Collection and Disposal Services
Term Contract
Results
Duluth, MN 55806

DNR3 Mille Lacs Kathio State Park Garbage Service
Post-Bid
Onamia, MN

Waste Collection
Results
Pine City, MN - Dresser, Osceola, Trego, WI

Disaster Recovery Services
Post-Bid
Fergus Falls, MN

Various CSAH Striping
Renovation
Results
MN

Reported 11/20/2021 12:00 AM
Project Title

Snow Plowing/Removal Services

Physical Address View project details and contacts
City, State (County) Onamia, MN 56359   (Mille Lacs County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling, Maintenance
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor will be responsible for clearing snow and ice and for distributing salt/ice-melt in all parking lots and areas listed on bid. Below is a list of all district building requiring snow removal and salting: Bus Garage Parking Lot – needs to be completed by 5:30am High School Parking Lot (East, West and North Side) – needs to be completed by 7am Elementary Parking Lot (South, East and West Side) – needs to be completed by 7am Rolf Olsen Center/Lions Community Center – needs to be completed by 7:30am Snow removal shall occur when two (2) inches or more of snow/sleet, etc. accumulates on the ground surfaces. The School District reserve the right to request additional snow removal as needed. The School District reserves the right to postpone snow removal operations when weather or other conditions necessitate a reduction of snow removal services. Snow must be removed from the ground surfaces and placed in collection areas in a manner which does not create snow piles/mounds which may cause dangerous conditions at any facility. The Contractor shall provide the necessary equipment to remove any excess snow accumulation. The Contactor shall not push snow into unauthorized areas, and if done, the Contractor, at its sole cost and expense, shall be required to remove snow from unauthorized areas. If the Contractor damages School District property (e.g. grass, parking blocks, signs, etc.) it shall be repaired at Contractor’s sole cost and expense to a condition as good as prior to such damage. Repairs shall be completed by May 1st of the snow season. The Contractor will have “on call” services available, twenty four (24) hours a day, seven (7) days a week. All snow removal services must be available at the Contractor’s pricing between November 1 and April 30. Non-approved snow removal services will not be paid for. The Contractor must be insured.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents