Similar Projects
Kimbeland Pump Station Improvements
Renovation
Bidding
Jackson, MO

Submersible Pump - Maryland Heights Pump Station
Infrastructure
Bidding
Columbia, MO

North Union Street Sanitary Sewer and Lift Station and North Industrial Park Sanitary Sewer Extension
Infrastructure
Post-Bid
Jackson, MO 63755

11th Plat Pump Station Repairs 2021
New Construction
Post-Bid
Kansas City, MO

FF Highway Pump Station Retrofit
New Construction
Results
Parkville, MO

Raw Water Pump Station, Value Vault and Zebra Mussel Control
Renovation
Results
Smithville, MO

Pump Station
New Construction
Post-Bid
California, MO

15th Street Pump Station Upgrade and Sewer Separation
Demolition
Results
Kansas City, MO

Pelham and Central Regional Lift Station
New Construction
Post-Bid
Sedalia, MO

Water Plant Filter Gallery and Return Sludge Pump Station Pipe Coating
Renovation
Results
Saint Peters, MO 63376

Electrical Substation Upgrade
New Construction
Post-Bid
Independence, MO 64050

Wastewater Treatment Facility Improvements
New Construction, Infrastructure
Results
Laredo, MO

Industrial Park Lift Station Replacement
New Construction
Post-Bid
California, MO

Contract 4: High Service Pump Station and Clearwell
Renovation
Results
Lexington, MO

Low Lift 2 Upgrade/Replacement
Renovation
Post-Bid
Festus, MO

Last Updated 02/22/2022 11:12 AM
Project Title

Earth City Expressway Pump Station (P-708) Replacement

Physical Address View project details and contacts
City, State (County) MO   (Saint Louis County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,427,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of Pump Station P-708, construction of approximately 59 lineal feet of 6" diameter force main, approximately 26 lineal feet of pipe 24" in diameter, and approximately 36 lineal feet of CIPP liner of pipe 24" in diameter. and appurtenances.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents