Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Y--Station Service Replacement_Fl-Fg
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Dutch John, UT 84023

Phoenix Area Facilities Technical Specialist Services
Term Contract
Bidding
Phoenix, AZ - Winterhaven, CA

General Contractor and Electrical Contractor Timpanogos
Addition
Post-Bid
American Fork, UT

Provo River Trail Solar LED Lighting
Post-Bid
Provo, UT 84606

Phase II Street Lighting Project
Results
$500,000 to $600,000 est. value
Orem, UT 84057

Electrical Services
Results

Multi-Site Backup Generator Installation
Post-Bid
Provo, UT 84604

LC 309 311 Remodel
Results
$140,000 est. value
Orem, UT 84058

Tanner to Mountain Vista OPGW Installation
Post-Bid
Provo, UT

DFCM Construction Pre-Qualified Electrical-Utah National Guard - American Fork Emergency Generator
Results
$295,000 est. value
American Fork, UT 84003

Keller Building LED 2021
Alteration
Post-Bid
Orem, UT

Provo City Covey Center Studio Remodel
Results
Provo, UT 84601

DFCM Construction - Pre-Qualification-General/Mechanical/Electrical/Roofing/Paving/Civil Contractors
Term Contract
Post-Bid

Lehi City North Point Substation Transformers
Alteration
Results
$7,000,000 est. value
Lehi, UT

Last Updated 03/11/2022 04:15 AM
Project Title

DFCM Construction-Pre-Qualified General-UVU Multi-Building Lighting and Ceiling Grid Replacement

Physical Address View project details and contacts
City, State (County) Orem, UT 84058   (Utah County)
Category(s) Single Trades
Sub-Category(s) Electric, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $375,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolish existing acoustical grid ceilings and install new acoustical grid ceilings in various locations in UVU’s Culinary Arts, Browning Administration, and Gunther Trades buildings. Install new lighting fixtures and HVAC grills as noted, accommodate and adjust fire sprinkler heads as needed, re-install various fire alarm, A/V, telecom and other ceiling mounted devices as needed.

Details

Division 09 - Finishes, Specialty Ceilings.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents