Similar Projects
FY 2022 Resurfacing Peachtree Corners City Streets
Infrastructure
Bidding
Less than $2,000,000 est. value
Peachtree Corners, GA

5.486 Miles of Milling and Plant Mix Resurfacing on US 10/SR 10
Infrastructure
Bidding
GA

Restoration of Utility Repairs on an Annual Contract
Term Contract
Post-Bid
GA

T32-D1-PCC-SR 316 Gwinnett-111734
Post-Bid
GA

Southern Region Disaster Recovery Support BPA
Results

Provision of Precision Laser Grading Services
Results
Lawrenceville, GA

Medlock Bridge Road at North Peachtree Street / Langford Road Intersection Improvement Project
Infrastructure
Bidding
GA

Provision of a HMO Program on an Annual Contract
Term Contract
Post-Bid
Lawrenceville, GA 30042

Five Forks Middle School Parking Addition
Results
Lawrenceville, GA 30044

Traffic Improvement Project
Infrastructure
Bidding
GA

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Asphalt Rehabilitation/Stabilization 12-17 Location
Results
Less than $2,254,000 est. value
Lawrenceville, GA 30046

Honest Alley Parking and Dumpster Enclosure Project
Infrastructure
Bidding
Lawrenceville, GA

2021 LMIG Paving Project
Post-Bid
Buford, GA

SR 84/Grayson Parkway at Ridgedale Drive Intersection Improvement Project
Results
Lawrenceville, GA 30046

Reported 09/09/2021 12:00 AM
Project Title

2021 Street Resurfacing

Physical Address View project details and contacts
City, State (County) Norcross, GA   (Gwinnett County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The contractor shall furnish all materials, equipment, and labor to complete the required construction as described in its entirety to the specifications as directed and the terms of this contact including all incidentals as directs by the City of Norcross Director of Public Works, Utilities & Parks, or her representative. Unless otherwise specified all work shall be completed in accordance with Georgia Department of Transportation Standard Specifications (Current Edition). The work location and descriptions follow but are not limited to: 1. Business Park Drive from North Peachtree Street to Peachtree Industrial Blvd (9,525 SY): Mill asphalt pavement 1.5”, Overlay with 12.5 mm Superpave. Patching as needed, striping as directed. Streets scheduled for milling and resurfacing will include repairing the existing pavement base, resurfacing of adjacent driveways to meet street pavement grades, adjustments of water valves & manholes, and the installation of pavement markings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents