Similar Projects
BP4 and BP5 - Ball Fields and Indoor Practice Facility
Post-Bid
Ypsilanti, MI

Gun Lake Park Improvement Services
Post-Bid
Wayland, MI

Bird Elementary School Paving Expansion and P-CEP JV Track and Field Replacement Project
Results
Plymouth, MI

Island Park Community Arts Pavilion
Results
Less than $53,000 est. value
Mount Pleasant, MI

Park Promenade Development
New Construction - 165,000 SF
Construction
$10,000,000 CJ est. value
Woodhaven, MI 48183

Early Childhood Education Center
New Construction - 58,000 SF
Construction
$15,000,000 est. value
Detroit, MI

Laketon Township Horton Park Improvements DLZ Project
Post-Bid
Muskegon, MI 49445

Brandon Park Expansion
Results
Ortonville, MI

City Line Apartments
New Construction
Construction
Kentwood, MI 49548

2020 Softball Facility Improvement
Post-Bid
Big Rapids, MI

Natural Playground and ADA Upgrades to Peasley Park
Results
Less than $89,945 est. value
Huntington Woods, MI

2020 Sf Projects – Running Track Replacement
Post-Bid
Onekama, MI 49675

Design/Construction Services for Mckinley Park Improvements Project
Results
Flint, MI

Mckinley and Farnumwood Playground Installation Services
Post-Bid
Flint, MI 48503

Practice Football Field Improvements
Results
Dearborn, MI

Last Updated 01/26/2021 04:40 PM
Project Title

Mill Creek Park Slope Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Dexter, MI 48130   (Washtenaw County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes all work within the boundary of Phase 1, on both sides of existing timber steps, as indicated on attached site plan as “PHASE 1 BOUNDARY.” All work shall conform to the specifications outlined in Attachment 5 and on the site drawings. Earthwork – Cut grade to depth as indicated on plans. Remove and haul cut soil to disposal site. Slope shall be shaped under direction of landscape architect. The purpose is to decrease the steepness of the slope both downhill and towards stairs. Slope Clearing – Cut existing trees to ground, leave stumps, but immediately treat with an appropriate herbicide. Remove sapling and seedling tree roots in areas of slope cut. Existing large caliper trees to be removed to be determined in coordination with landscape architect. Cut and remove trees, saplings, and debris from site. Plantings – Install shrubs and trees as indicated on site plan and attached bid form. The list and quantities of plant species for Phase 1 of this project is provided in the bottom left corner of page 2 of the site drawings. Restoration – Restore any impacted areas surrounding site, including but not limited to grass restoration, concrete repair, and timber repair. Mulch – Installation of shredded bark mulch. Plant Maintenance – Maintain and warranty plants for one year following completion of the project.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents