Similar Projects
New Junior High School
New Construction - 140,000 SF
Conception
$57,000,000 est. value
Mahomet, IL

Lincoln Trail Elementary School Renovation
Renovation - 25,000 SF
Conception
$14,000,000 est. value
Mahomet, IL 61853

Champaign County Detention Center Expansion
Addition, Demolition, Infrastructure
Design
$3,000,000 CJ est. value
Urbana, IL 61802

Mahomet Pump Station Improvements
Renovation, Infrastructure
Bidding
$212,000 CJ est. value
Mahomet, IL 61853

Construction of Boneyard Creek Segment 3 Bank Stabilization
Infrastructure
Bidding
$904,000 CJ est. value
Urbana, IL 61801

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Edison Middle School - South Stair Repair
Renovation, Addition
Post-Bid
Champaign, IL 61820

New International Prep Academy (IPA)
New Construction - 76,000 SF
Results
Less than $24,300,000 est. value
Champaign, IL 61821

Central HS Combes Gym
Renovation
Results
Champaign, IL 61820

Modernize and Restructure the Urbana-Champaign Campus Library - University of Illinois
Renovation, Infrastructure
Pending Verification
$54,000,000 CJ est. value
Urbana, IL 61801

Garden Hills Detention Basin Phase 2 - City of Champaign
Infrastructure
Pending Verification
$20,000,000 CJ est. value
Champaign, IL 61820

Middletown Prairie Elementary School Addition
Addition - 13,000 SF
Conception
$5,000,000 est. value
Mahomet, IL 61853

Door Replacement At Eastlawn Elementary School
Alteration
Post-Bid
$166,000 est. value
Rantoul, IL 61866

Rantoul High School 2021 Interior
Renovation
Results
Rantoul, IL 61866

Garden Hills Detention Basin Phases 3 - City of Champaign
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Champaign, IL 61821

Last Updated 08/12/2022 10:05 AM
Project Title

RFQ Construction Manager - Additions, Renovations and New Facilities

Physical Address View project details and contacts
City, State (County) Mahomet, IL 61853   (Champaign County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $420,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of a combination of additions, renovation, new facilities, and building demolition at five (5) sites in the Mahomet Seymour CUSD #3 School District. More detailed information can be found at www.bulldogblueprint.com. The two new facilities: 1. A new 140,000sf 6th - 8th grade facility to replace the existing Mahomet Seymour Junior High (MSJH). This includes all site work, paving, bus, and car drop off, as well as an 8-lane track, baseball field and softball field. This is located on property south of the existing Middletown Prairie Elementary School (MPE) in East Mahomet. 2. A new bus barn and transportation facility with associated paving and parking. This is also located south of the existing MPE facility. Additions and renovations are happening at three (3) of the existing facilities. 1. Mahomet Seymour High School (MSHS) is to receive a new approximately 35,000sf fine arts wing with band, choir, art, and performance space (auditorium), and support spaces. Renovations include roughly 11,800sf of vacated fine arts spaces into additional PE lockers, and classrooms. Site work includes new turf at varsity field, a second turf JV field, rebuilt 8-lane track, and turf baseball and softball fields. 2. Lincoln Trail Elementary (LTE) is to receive approximately 25,000sf addition and roughly 11,800sf of renovations to existing library and core spaces to provide student support spaces. Additionally, site work to provide improved site circulation, bus drop, etc. 3. MPE is to receive a 10-classroom addition and minor site improvements as needed. Lastly, demolition of the existing MSJH (roughly 80,000sf) is called for upon completion of the project - this scope is TBD. The purpose of this Request for Qualifications (RFQ) is to identify those firms most capable of delivering the professional preconstruction and construction management services required for the successful delivery of the Additions, renovations, new facilities and building demolition at five sites in Mahomet-Seymour CUSD #3(hereinafter, the "Project"). Through the RFQ process, the District intends to determine which firm should be awarded an AIA A134-2019 Edition - Standard Form of Agreement Between Owner and Construction Manager as Constructor without a Guaranteed Maximum Price as modified by Owner. Additional dates related to the review, response, and additional information requests will be shared with the submitting firms once finalized.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents