Similar Projects
45--Saguaro National Park Requires The Replacement of HVAC
Bidding
Tucson, AZ 85748

HVAC Supplies
Term Contract
Post-Bid
Tucson, AZ 85701

On-Call/Emergency Services
Post-Bid
Marana, AZ 85653

VA Tucson Replace AHUs for Critical Care and Sterile Processing
Results
$2,000,000 to $5,000,000 est. value
Tucson, AZ 85723

Safford K-8 School Boiler and Chiller Replacement
Results
Less than $604,872 est. value
Tucson, AZ 85701

DEMA SBAH Bldg L4535 Chiller Replacement (M20-0012) Single
Post-Bid
Marana, AZ

Dunham Elementary School Chiller Replacement
Term Contract
Results
Less than $539,465 est. value
Tucson, AZ 85748

VA Tucson Replace Air Distribution Systems - Building 57
Post-Bid
Tucson, AZ

Cavett, Manzo and Wheeler Elementary Schools Kitchen A/C Conversion
Term Contract
Results
$250,000 to $300,000 est. value
Tucson, AZ 85745

DEMA HVAC Duct Repair L4605 Silverbell Single
Post-Bid
Marana, AZ 85653

Pistor Middle School Chiller Replacement
Term Contract
Results
Tucson, AZ 85746

Robert Naylor K-8 School Kitchen A/C Conversion
Post-Bid
Tucson, AZ 85711

Dema Sbah Bldg L4535 Chiller Replacement
Results
Marana, AZ 85653

Utterback Middle School Kitchen A/C Conversion
Post-Bid
Tucson, AZ 85713

Dema HVAC Replacement Building L4100 (M20-0046) Single
Results
Marana, AZ 85653

Last Updated 03/27/2020 12:27 PM
Project Title

Dema HVAC Replacement Classroom Area L4300 (M20-0007) Single

Physical Address View project details and contacts
City, State (County) Marana, AZ 85653   (Pima County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Furnish all labor, materials, equipment, freight and Sales Tax necessary to replace HVAC units as specified under a firm fixed fee. 2. Contractor shall install and provide the needed equipment over the Classroom area in building L4300, at Silver Bell Army Heliport at Marana, AZ. a) Disconnect and remove one 10 ton unit form curbing. b) Remove any remaining gases from unit and properly dispose of it off site. c) Remove unit from the roof and dispose of it properly off site. d) Contractor will provide and install new curbing and stand for HVAC unit. e) Install one, 10 ton Commercial grade, 12 SEER or better, gas pack unit, 410A, 460 volt, 35 amp, 3 phase. Unit must be Alerton, BACnet program with BACtalk systems compatible and ready. Energy Star efficiency rated units are the only type unit accepted. f) Economizer shall be used in lieu of an outside air damper. g) Contractor will use the fused disconnect box, breakers, all conduit and junction boxes already on site and installed by owner. h) Upon completion of the installation a test run shall be performed on both the cooling and the heat side of the unit. i) All quotes must list materials with price, labor charges, sales tax and freight on separate lines in the quote. j) All lifting devices for man, special tools and equipment are the responsibility of the contractor.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents