Similar Projects
Wausau - Merrill Constr / Resurface
Infrastructure
Conception
$7,000,000 CJ est. value
Wausau, WI 54401

Camp Phillips Road Town Homes
New Construction, Infrastructure
Design
$45,000,000 CJ est. value
Weston, WI 54476

New Riverlife Apartment Complex
New Construction, Infrastructure
Design
$75,000,000 CJ est. value
Wausau, WI 54401

Veteran's Park Ball Complex
New Construction, Infrastructure
Bidding
$5,726,689 CJ est. value
Marathon, WI 54448

RFP - Purchase and Develop Village Owned Property at 5500 Schofield Avenue
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Weston, WI 54476

Veteran's Park Advanced Grading
Infrastructure
Post-Bid
$230,000 est. value
Marathon City, WI 54448

2019 Riverfront Trash Enclosures
Infrastructure
Post-Bid
$200,000 CJ est. value
Wausau, WI 54403

Wastewater Treatment Plant Improvements
Renovation
Results
Marathon City, WI 54448

2023 Hatley Wastewater Treatment Package Plant Rehabilitation
Renovation
Results
$199,300 CJ est. value
Hatley, WI 54440

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Old Highway 51 Reconstruction STH 34 - Bird Lane
Infrastructure
Construction
$2,029,144 CJ est. value
Knowlton, WI 54455

South 1st Avenue Apartments
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Wausau, WI 54401

The Foundry on 3rd
New Construction, Infrastructure - 141,515 SF
Pending Verification
$44,000,000 CJ est. value
Wausau, WI 54403

V Marathon City, Main Street Const / Resurface
Infrastructure
Design
$500,000 CJ est. value
Marathon, WI 54448

2023 Lead Service Line Replacement Project
Infrastructure
Bidding
$627,182 CJ est. value
Wausau, WI 54403

Last Updated 06/09/2023 11:22 AM
Project Title

Drinking Water Treatment Facility PFAS Treatment

Physical Address View project details and contacts
City, State (County) Wausau, WI 54401   (Marathon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $22,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

General construction of a drinking water treatment facility including sitework, yard piping, CMU building, pressure vessels for granular activated carbon treatment, process piping and equipment, plumbing, heating, ventilation, air conditioning, electrical and instrumentation and control. Pre-Qualification: Yes Est. Completion Date: Nov. 22, 2024 Site Directions: Exit USH 51 at West Campus Drive; proceed 1.1 miles east on West Campus Drive; turn left onto Burek Avenue. The driveway to the Wausau Drinking Water Treatment Facility is on your right. Questions regarding the bid documents should be directed to Donohue & Associates attention: Susan Wojtkiewicz, email swojtkiewicz@donohue-associates.com. Contract Times: Substantial Completion within 450 days; Final Completion within 480 days

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents