Similar Projects
22nd Street North East and B Avenue Intersection
Conception
$150,000 est. value
Cedar Rapids, IA 52402

Lindale Trail Phase I from Council Street to E/o C Avenue North East
Conception
$2,600,000 est. value
Cedar Rapids, IA 52407

PCC Sidewalk/Trail
Infrastructure
Bidding
IA

PCC Overlay
Infrastructure
Bidding
IA

West Grand Business Park Grade, Pave, and Utilities
Infrastructure
Post-Bid
West Des Moines, IA 50266

West Grand Business Park Grade, Pave, and Utilities
Infrastructure
Post-Bid
West Des Moines, IA 50266

Clover Lane Overlay
Results
Asbury, IA

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

9Th Avenue South East Improvements from 3rd Road Street to Railroad
Conception
$200,000 est. value
Cedar Rapids, IA 52407

PCC Pavement - Grade and Replace
Infrastructure
Bidding
IA

Easton Valley High School Parking Lot
Infrastructure
Post-Bid
Preston, IA 52069

Western Ingersoll Run Sewer Separation Phase 2
Alteration
Results
$6,750,000 est. value
Des Moines, IA

Sanitary Sewer South of East Avenue/ West of 80Th Street
Conception
$830,000 est. value
Cedar Rapids, IA 52407

PCC Pavement Widening
Infrastructure
Bidding
IA

PCC Pavement Patching
Infrastructure
Post-Bid
IA

Last Updated 12/15/2021 10:20 AM
Project Title

Fort Dodge CSI Phase 2 - 10th Avenue North

Physical Address View project details and contacts
City, State (County) Fort Dodge, IA 50501   (Webster County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Full reconstruction of 10th Avenue North from N. 24th Street to N. 29th Street. Removal and Replacement of sanitary sewer, storm sewer, water main, roadway and driveway paving. Sidewalks, some trail reconstruction, and seeding will be included. Project length is approximately 2300 linear feet.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents