Similar Projects
Rimer Pond Road and Hardscrabble Road Waterline Extension (WM3872) CDBE
Bidding
Blythewood, SC 29016

St. Stephen Water Line Improvements Project
Bidding
SC

Howard Street Phase 2, Cleveland Park Area Waterline Rehabilitation Project
Post-Bid
Spartanburg, SC 29301

Clem's Brand/Sugar Creek Interceptor Phase III
Post-Bid
SC

Replacement of All Existing Waterlines and Meters
Results
Less than $2,859,092 est. value
Bethune, SC 29009

Ehrenclou Drive Water and Sewer Line Extensions
Results
Less than $199,038 est. value
Camden, SC 29020

Kay Street Waterline Replacement
Bidding
$250,000 to $300,000 est. value
Belton, SC 29696

Water Sewer System Improvements - Connelly Road - 6" Main
Post-Bid
Pickens, SC

Highway 327 and Highway 57 Water Line Relocation
Results
Florence, SC

Asbestos-Cement Water Main Replacement
Bidding
Goose Creek, SC 29445

Joanna Waterline Improvements
Post-Bid
SC

Calhoun Avenue 12-Inch Water Main Replacement
Results
Less than $486,218 est. value
Greenwood, SC

Water Distribution System Modernization
Bidding
$15,000,000 est. value
Denmark, SC

Creekview Drinking Water Distribution Rehabilitation Project
Post-Bid
$150,000 to $200,000 est. value
Clemson, SC

Kitson Street/Lowell Avenue 6-Inch Water Main Replacement
Results
Less than $505,400 est. value
Greenwood, SC 29648

Reported 01/09/2021 12:00 AM
Project Title

Sewer and Water Lines Project

Physical Address View project details and contacts
City, State (County) Florence, SC 29063   (Florence County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of approximately 2400 LF of 4" force main, 5000 LF of 8" sewer line, 3200 LF of 8" water line, 6000 LF of 6" water line, along with a 15' deep, 6' diameter pump station and all related work and appurtenances. The Bids should be separated into On-site and Off site work with the pump station being part of the off site work. Please include all labor and materials in the bid along with an estimated time to complete from start to finish.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents