Similar Projects
Pueblo Water - Annual Contract for Stainless Steel Repair Clamps 2022
Term Contract
Results
Pueblo, CO

Installing Corrugated Steel Plates
Alteration
Results
$1,000,000 to $5,000,000 est. value
Byers, Denver, CO 80238

Installing Corrugated Steel Plates
Alteration
Results
$1,000,000 to $5,000,000 est. value
Byers, Denver, CO 80238

Galvanized Steel Beams
Alteration
Results
CO

Installing Corrugated Steel Plates
Alteration
Results
$1,000,000 to $5,000,000 est. value
Byers, Denver, CO 80238

Installing Corrugated Steel Plates
Alteration
Results
$1,000,000 to $5,000,000 est. value
Byers, Denver, CO 80238

Galvanized Steel Beams
Alteration
Results
CO

Stainless Steel Countertop for Evidence Storage
Alteration
Results
Greeley, CO 80634

Steel
Results
CO

Steel
Alteration
Results
CO

SEP Williams Creek Substation High Steel
New Construction
Results
Fountain, CO

Sep Horizon High Steel
Alteration
Results
CO

Stainless Steel Hydraulic Pipe
Post-Bid
Denver, CO

Steel Lining Insert Pipe
Alteration
Post-Bid
Berthoud, CO 80513

Pueblo Water - Annual Contract for Stainless Steel Repair Clamps 2021
Term Contract
Results
Pueblo, CO

Reported 06/18/2022 12:00 AM
Project Title

Welding Steel

Physical Address View project details and contacts
City, State (County) Westminster, CO 80031   (Adams County)
Category(s) Single Trades
Sub-Category(s) Steel
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Fabrications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents