Similar Projects
5th Street Bridge Utility Relocation
Infrastructure
Bidding
New Smyrna Beach, FL

Two Inch Water Main Replacement - FY22
Infrastructure
Bidding
$900,000 est. value
Edgewater, FL

Potable Water Main Replacement Project
Infrastructure
Post-Bid
$9,000,000 est. value
Orange City, FL

North Campus Water Main Loop
Infrastructure
Post-Bid
Daytona Beach, FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Construction Management/General Contracting Services for Deleon Springs Utility Extensions
Results
Less than $4,000,000 est. value
De Land, FL 32720

N. US 1 Water Main/Force Main Extension
Results
Less than $3,430,050 est. value
Ormond Beach, FL 32175

Sugar Mill Drive 20-Inch Reclaimed Main Relocation
Results
New Smyrna Beach, FL 32168

Construction Management at Risk for Underground Utility Services
Results
Ormond Beach, FL 32175

FY 2020 Water Main Improvements
Results
Less than $1,500,000 est. value
De Land, FL

Furnish and Deliver PVC and HDPE Pipe for 2020 Water Main Improvements and State Road 44 Utilities Relocation
Results
De Land, FL 32720

Group 1 Water Main Replacements
Results
Less than $2,773,256 est. value
Deltona, FL

Birmingham Avenue and Kansas St. Watermain Replacement
Results
Less than $185,000 est. value
Holly Hill, FL

Ridgewood Avenue and Farmbrook Road Watermain Improvements
Results
Less than $600,000 est. value
Port Orange, FL

Construction Manager at Risk Pipe Rehabilitation and Looping Disinfection By-Product Reduction Project
Results
Less than $6,000,000 est. value
Orange City, FL

Last Updated 12/06/2021 08:21 AM
Project Title

Alabama Avenue Reclaimed Water Main Extension

Physical Address View project details and contacts
City, State (County) Deland, FL 32720   (Volusia County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,075,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of approximately 5,200 linear feet of 18-inch HDPE and PVC reclaimed water main along S. Alabama Avenue, extending through Earl Brown Park and running south along S. Amelia Avenue to a connection point within the Wiley M. Nash Water Reclamation Facility.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents