Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

SR 138/207 Resurfacing, Undivided System
Infrastructure
Design
$2,023,251 CJ est. value
Chillicothe, OH 45601

SR 138 - Culvert Preservation
Infrastructure
Design
$300,000 CJ est. value
Clarksburg, OH 43115

Punderson State Park, Elevated Water Storage Tank Rehabilitation Rebid
Infrastructure
Bidding
$580,340 CJ est. value
Newbury, OH 44065

Two Lane Resurfacing - PIK/ROS-41
Infrastructure
Bidding
$1,857,860 CJ est. value
Chillicothe, OH 45601

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Well No. 24 and Raw Water Main
Results
Chillicothe, OH 45601

Bainbridge Township Waterline Extension
Infrastructure
Results
OH

SR 306 - Minor Widening
Infrastructure
Bidding
$1,300,000 CJ est. value
Novelty, OH 44072

CRCPL Site Improvement Project
Alteration
Results
$340,285 est. value
Chillicothe, OH 45601

Increase Back-Up Electrical Generation and Site Distribution
Demolition, Infrastructure, Renovation
Bidding
$5,000,000 CJ est. value
Chillicothe, OH 45601

Sanitary Sewer Improvements - Collection
Infrastructure
Results
$7,700,000 CJ est. value
Bainbridge, OH 44023

Culvert Replacement - US 322
Infrastructure
Bidding
$2,020,000 CJ est. value
Chardon, OH 44024

Last Updated 08/22/2022 11:37 AM
Project Title

Sanitary Sewer Improvements - WWTP

Physical Address View project details and contacts
City, State (County) Bainbridge, OH 44023   (Geauga County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,650,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Addenda and Interpretations: Questions regarding the information contained in this Advertisement and the associated bid documents shall be submitted in writing and emailed to: gsilcott@dlz.com (740) 380-2828 and to be given consideration must be received at least seven days prior to the advertisement submittal date. All such interpretations and any supplemental instructions will be in the form of written addenda to the Advertisement and bid documents, which if issued, will be posted no later than three days prior to the submittal date. Each bid shall be accompanied by a Bid Guaranty and Contract Bond as required by Section 153.54 of the Ohio Revised Code in an amount equal to the sum of the bid submitted by each contractor. In lieu of posting the bond, a bidder may use a Cashier's Check, Certified Check or Letter of Credit for ten percent of the Contractor's bid as bid security. When a check or letter of credit is used, the bidder shall be required to post a 100 percent Performance Bond and a 100 percent Labor and Material Payment Bond, upon the signing of the contract. Failure to submit the Bid Guaranty Bond and the required notarized affidavits with the bid shall be cause for considering the bid submission incomplete and for the rejection of the bid. Each bid must contain the full name of the party or parties submitting the bid and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. All contractors and subcontractors involved with the project will, to the extent practicable use Ohio Products, materials, services, and labor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123.2, the Governors Executive Order of 1/27/72, and Governor's Executive Order 84-9 shall be required. The Owner reserves the right to reject any and all bids, and the right to accept the lowest and best bid, the right to waiver minor irregularities on any bid, and the right to accept the bid proposal which promotes the best interest of the Owner. Federal Prevailing Wage Rates and Equal Employment Opportunity requirements are applicable to this project. The proposed work is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968 and the implementing regulations at 24 CFR part 75. The criteria for determining eligibility as a Section 3 business concern can be found in 24 CFR 75.5 and the selected Contractor's Section 3 obligations, as described at 24 CFR 75.19. This project is subject to the State of Ohio's Encouraging Diversity, Growth, and Equity ("EDGE") Business Development Program. A Bidder is required to submit with its Bid and with its Bidder's Qualifications form, certain information about the certified EDGE Business Enterprise(s) participating on the Project with the Bidder. Refer to Section 24 of the Instructions to Bidders. The EDGE Participation Goal for the Project is 5.0 percent. This construction of this project will be funded in part with funds made available from the Federal Government through the US Army Corps of Engineers Section 594 program. Bidders must comply with all applicable laws and regulations for construction projects receiving Federal aid including, but not limited to, the Civil Rights Act of 1964, the Contract Work Hours and Safety Standards Act, and the Davis-Bacon Act as amended. Domestic steel use requirements as specified in section 153.011 of the revised code apply to this project. Copies of section 153.011 of the revised code can be obtained from any of the offices of the department of administrative services.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents