Similar Projects
New A/C Unit for Ft Dodge
Renovation
Design
$100,000 CJ est. value
Anamosa, IA 52205

HVAC Installation and Temperature Monitoring System for Server Room – City Hall
Renovation
Sub-Bidding
$490,000 CJ est. value
Clinton, IA 52732

Building 154 South Steam Header Bypass Valve Replacement
Renovation
Sub-Bidding
$100,000 CJ est. value
Ames, IA 50010

Camp Dodge S-52 HVAC and Lighting Upgrades
Alteration
Post-Bid
Johnston, IA

Washington CSD High School Mechanical Upgrades
Alteration
Post-Bid
Washington, IA 52353

Marion High School HVAC Upgrades
Alteration
Results
Marion, IA 52302

Boone CSD High School HVAC Upgrades
Alteration
Results
$2,300,000 to $2,600,000 est. value
Boone, IA 50036

Science Hall - Rooms 0102 & 0152 - Ventilation Improvements
Renovation
Sub-Bidding
$250,000 CJ est. value
Ames, IA 50011

Water System Improvements
Term Contract
Post-Bid
Storm Lake, IA 50588

Law Enforcement Center Rooftop Mechanical Replacement
Alteration
Results
Algona, IA 50511

PPW Piping Repairs
Renovation
Sub-Bidding
$250,000 CJ est. value
Ames, IA 50010

North Linn MS/ES 2022 Remodel and Ventilation Improvements - Equipment
Renovation, Alteration
Post-Bid
Coggon, IA 52218

HVAC Improvements and Window/Door Replacements
Alteration
Results
Ackley, IA

Family Resource Center-Remodel
Renovation
Sub-Bidding
$143,000 CJ est. value
Ames, IA 50011

Evans Middle School Gym and Auditorium HVAC
Alteration
Post-Bid
Ottumwa, IA 52501

Last Updated 04/28/2023 06:05 AM
Project Title

Improve Terminal Building (Upgrade HVAC System Controls)

Physical Address View project details and contacts
City, State (County) Waterloo, IA 50703   (Black Hawk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Description: Project consists of the replacement of the existing HVAC control system within the Waterloo Airport (ALO) terminal building. Plan sheets are bound at the back of the specification book. No separate plan set is provided. Additional Description: Existing HVAC not compatible with current electronic controls. Project upgrades existing HVAC DDC head-end equipment, replaces non-functioning portions of HVAC control system, provides freeze protection for AHU hot water coils, rebalances the system to ensure proper operation and control. Upgraded head-end equipment is to be installed on a networked computer that will allow remote monitoring and control of HVAC system. This project is scheduled to be completed on a 180-calendar day working schedule. An exact completion date is a required field in the project information page of the website; but the actual completion date will be based on 180 calendar days once the contract has been executed. Site Directions: <2790 Livingston Lane>

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents