Similar Projects
Heating, Ventilation and Air Conditioning Upgrade and Chilled Water Line Installation at the Harris County Credit Union Parking Garage
Bidding
Less than $1,000,000 est. value
Houston, TX 77002

Heating, Ventilation and Air Conditioning Upgrade and Chilled Water Line Replacement at Annex 60
Bidding
Less than $2,000,000 est. value
Houston, TX 77093

HVAC Equipment, Installation, Service, and Related Products
Post-Bid
Houston, TX 77270

Ventilation System at Annex 46
Post-Bid
Houston, TX 77002

Refurbishment of Air Handling Units
Results
$2,600,000 est. value
Houston, TX 77030

HVAC Equipment, Supplies, and Related Items
Term Contract
Results
Baytown, TX

Administration Building Mechanical Renovations
Bidding
$3,000,000 est. value
Houston, TX 77024

Administration Building HVAC Upgrades
Post-Bid
Houston, TX 77015

Chiller Replacement Project
Results
Houston, TX 77000

Carpet Tile and Cove Base
Post-Bid
Houston, TX 77251

Install New Chiller
Results
Houston, TX

HVAC Refrigerants
Term Contract
Post-Bid
Houston, TX 77064

Replace Two Air Conditioning System
Results
Houston, TX 77040

JCP Portrait Studio Carpet Refresh Texas
Post-Bid
Arlington, Houston, Katy, Rosenberg, TX 77001

Installation of Heat Exchanger at the North Bayou Central Plant for Harris County
Results
Houston, TX 77002

Last Updated 06/05/2020 03:11 PM
Project Title

Informal - Floor Preparation, Coating and Anti-Slip Additive for PHA Cmain HVAC

Physical Address View project details and contacts
City, State (County) Houston, TX 77020   (Harris County)
Category(s) Single Trades
Sub-Category(s) Flooring, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Removal of Existing flooring and Adhesive; 2190 SQ FT 2. Diamond grind and completely vacuum 2190 SQ FT of flooring in the Electrical/HCAC breakroom and offices to a smooth dustless state to provide a superior penetration of vapor barrier coating minimizing pits and floor imperfections, floor must be compatible to ASTM C722-18 standards for monolithic coatings. Preparations for a ROCKHARD Elite Crete Metallic Staining process. 3. APPLY 1 coat of 2-part ELITE CRETE E100-B5 Epoxy Vapor Barrier; applied at 150 SQ FT per Gallon. 4. APPLY 1 coat of 2-part ELITE CRETE 100 PT1 Clear Epoxy HIGH WEAR/HIGH SOLID epoxy build coat, applied at 150 SQ FT per Gallon.

Details

Division 09 - Finishes, Flooring.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents