Similar Projects
Ravine and Streambank Site Restoration
Conception
$43,900 est. value
Beach Park, IL 60085

2020 Drainage Program Survey, Design and Permitting Services
Conception
Barrington, IL 60010

Sanitary Sewer System Improvements Contract A
Bidding
Tilton, IL 61833

Catch Basin and Inlet Cleaning 2020-2021
Term Contract
Post-Bid
Mount Prospect, IL 60056

Public Works Materials-2020
Term Contract
Post-Bid
Rockford, IL 61104

Manhole Cleaning
Results
Palos Park, IL 60464

2020 Manhole Rehabilitation
Results
$337,726 to $359,476 est. value
Elk Grove Village, IL 60007

JMTC-RI Concrete Trench Fill-In
Post-Bid
Rock Island, IL 61299

2020 Sanitary Sewer Inspection and Rehabilitation
Results
Oak Lawn, IL 60453

Corrugated Steel Pipe
Post-Bid
Knoxville, IL 61448

Removal and Replacement of an Existing 32-Foot Long 18" X 24" Culvert With A Proposed 48-Foot Long 36" X 72" Cast in Place Culvert (Proposed SN 016-2272)
Results
IL

Pipe Culverts
Post-Bid
Hardin, IL 62047

Slope Stabilization Project On Il Rte 83 From North Of Glenwood Dyer Road To South Of Glenwood Lansing Road That Includes Guardrail Replacement
Results
IL

Sewer Root Control Treatment
Term Contract
Post-Bid
Saint Charles, IL 60174

Main Street Sewer Extensions
Results
$300,000 est. value
Pecatonica, IL 61063

Last Updated 09/09/2020 07:18 AM
Project Title

GPSD Sewer Rehabilitation Erosion Control, Project 1C

Physical Address View project details and contacts
City, State (County) Peoria, IL 61607   (Peoria County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $950,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Owner Project No. GPSD 2615 The proposed improvements consist of repairing a section of the levee along Kickapoo Creek that protects the drying beds. The levee section that is being repaired was damaged during he 2019 flooding along Kickapoo Creek and the Illinois River. The repair limits begin at GPSD's bridge across Kickapoo Creek and extend downstream approximately 1,250 FT. The improvements include clearing, earth excavation, embankment, armoring the embankment, top soil, seeding, and erosion control blanket.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents