Similar Projects
Augusta’s Roadways Sweeping Services (Street Sweeping) For Augusta
Bidding
Augusta, GA 30900

Augusta Stormwater Facility Maintenance
Bidding
Augusta, GA 30903

Sidewalk Cleaning
Post-Bid
Sandy Springs, GA 30328

Street Sweeping Services
Term Contract
Post-Bid
Watkinsville, GA 30677

Vacant Lot Cleaning Services
Term Contract
Results
Augusta, GA 30900

General City Maintenance
Results
Flemington, GA

Athletic Field Maintenance
Bidding
Kennesaw, GA

T32 - District 1 Sweeping and Drain Cleaning
Post-Bid

Roswell Street and Waddell Street Streetscape Improvements
Results
Marietta, GA 30061

Commercial Sweeper Services for Parking Lot
Term Contract
Post-Bid
Alpharetta, GA 30009

As-Needed Vacant Lot Cleaning
Results
Atlanta, GA 30336

Dust Control Services
Term Contract
Post-Bid
Woolsey, GA 30214

Sweeping of Curbs and Intersections
Term Contract
Results
Lawrenceville, GA 30046

Citywide Street Sweeping
Post-Bid
Alpharetta, GA 30004

Parking Lots Sweeping Services
Results
Atlanta, GA 30324

Reported 08/29/2020 12:00 AM
Project Title

T32 - Sweeping and Drain Cleaning District 7

Physical Address View project details and contacts
City, State (County) (Clayton, Cobb, DeKalb, Douglas, Fulton, Rockdale Counties)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work will include SWEEPING OPERATIONS along interstate and state routes within areas identified herein. This includes mechanical sweeping of highway shoulders and bridge decks and cleaning of drains on shoulders, medians, ramps, and bridges. Work under this RFQ consists of furnishing all labor, materials, tools, equipment, means of transportation, and incidentals necessary to perform the services. Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel. The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform SWEEPING OPERATIONS at such time, and at such location(s) as per these specifications and/or as directed by the Engineer. Prior to start of work, Engineer must inspect equipment to ensure the equipment is fully operational for the performance of its intended purpose. The Contractor will also be responsible for all traffic control in compliance with current MUTCD standards, licenses, and permits required to satisfy the duties required herein.

Details

Division 01 - General Requirements, Cleaning and Waste Management.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents