Similar Projects
11th Avenue south of Talmadge Street - 642444105 - City of Kearney
Infrastructure
Conception
$500,000 CJ est. value
Kearney, NE 68845

Mid-States Irrigation Building
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Center, NE 68847

Terminal Building Expansion - City of Kearney
Renovation, Infrastructure
Design
$5,000,000 CJ est. value
Kearney, NE 68847

The Catholic Newman Center
New Construction, Infrastructure - 24,000 SF
Design
$11,600,000 CJ est. value
Kearney, NE 68847

2023 Paving Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Kearney, NE 68847

The Kearney Partner Office Building
Addition, Demolition, New Construction, Infrastructure
Sub-Bidding
$2,700,000 CJ est. value
Kearney, NE 68845

Culverts, General (All Classes)
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Kearney, NE 68847

Bridges, General (All Classes)
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Beaver, NE 68869

2022 Part 2 Improvements - 56th Street & Avenue N Turning Lanes
Infrastructure
Results
$1,063,315 CJ est. value
Kearney, NE 68847

Midtown Office Building- 2022 Ave A Project
New Construction, Infrastructure
Results
$664,095 CJ est. value
Prairie Center, NE 68870

New Elementary School - Elm Creek Public Schools
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$11,980,000 CJ est. value
Elm Creek, NE 68836

New Elementary School - Elm Creek Public Schools
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$11,980,000 CJ est. value
Elm Creek, NE 68836

Turkey Creek Fourth Subdivision
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Kearney, NE 68847

Driveway Replacement - Single Family Homes
Infrastructure
Post-Bid
Kearney, NE 68847

Evergreen Road Paving - County of Buffalo
Infrastructure
Pending Verification
$250,000 CJ est. value
Kearney, NE 68847

Last Updated 09/12/2023 01:45 PM
Project Title

Kearney Public Schools Windy Hills Elementary School Addition and Renovation

Physical Address View project details and contacts
City, State (County) Kearney, NE 68845   (Buffalo County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $224,442 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of a new 3,033 sf addition and a complete renovation of the 33,330-sf existing building. The new addition consists of a new secure entrance and administrative offices. Renovation will include classrooms, restrooms, staff work room, library, corridors, a full roof replacement, window and door replacement, new fire sprinklers, and upgraded mechanical and electrical systems. Specific work to include: demolition, concrete foundations and floors (new and replacement), interior CMU / masonry, structural and misc. steel, rough carpentry, finish carpentry, casework, insulation (batt, thermal, foam and spray), EIFS, air barriers, metal wall and soffit panels, composite framing support systems, EPDM roofing, flashings, intumescent fire protection, firestopping, joint sealants, expansion joint covers, hollow metal doors / frames / hardware, flush wood doors, operable partitions, access panels, coiling doors, aluminum storefront and glazing, gypsum drywall, metal stud framing, acoustical ceilings, tile (floor and wall), flooring, interior and exterior painting, display boards, toilet partitions, toilet accessories, fire extinguishers, plastic laminate lockers, plastic lockers, roller window shades, fire sprinklers, plumbing, HVAC, electrical, site prep, site concrete, and landscaping. The Owner shall have the right to reject any or all bids and to reject a bid not accompanied by any requiring bid security or by other data required by the bidding documents; or to reject a bid which is in any way incomplete or irregular and to waive any informalities in any proposal. If you should have any questions or require further assistance, please do not hesitate to contact Austin Larson of BD Construction at 308-234-1836

Details

3,033 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents