Similar Projects
Hilltop Drive and Moore Street Road Improvements
Post-Bid
Stockton, NJ 08559

Resurfacing of Homestead Road
Post-Bid
Califon, NJ 07830

Cokesbury Road Resurfacing and the 2019 Roadway Improvement Project
Results
$135,777 est. value
Lebanon, NJ

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Milford Road Improvement Project Sections III
Post-Bid
Frenchtown, NJ 08825

Main Street Improvements
Results
Califon, NJ 07830

Stanton Mountain Road Improvements Phase 2
Post-Bid
Lebanon, NJ 08833

Hunterdon County Routes 513 and 628
Results
$6,164,924 est. value
Flemington, Franklin, Glen Gardner, Lebanon, NJ 08822

Improvements to Sanford Road
Post-Bid
Sergeantsville, NJ 08557

Loop Road Paving at Hunterdon Central Regional High School
Results
$493,400 est. value
Flemington, NJ 08822

Main Street Improvement Project Sections I,II,III
Post-Bid
Hampton, NJ 08827

Route 31 from Route 173 to South Lincoln Avenue /Hawke Point Boulevard
Results
Less than $5,000,000 est. value
Clinton, Glen Gardner, Hampton, Lebanon, Washington, NJ 07882

2018-2019 NJDOT Municipal AID Funded Grant - George Street Improvements
Post-Bid
Lambertville, NJ 08530

Maintenance Job Order Contracting (JOC) Infrastructure Repairs, Central - 2020
Results
$5,000,001 to $10,000,000 est. value

Mill Road Improvement
Post-Bid
Lambertville, NJ 08530

Last Updated 07/28/2021 08:32 AM
Project Title

Grayrock Road, Fairview Avenue, Fulper Place, and Fulper Alley Improvements

Physical Address View project details and contacts
City, State (County) Clinton, NJ 08809   (Hunterdon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the furnishing of all labor, materials, and equipment necessary to complete the work as shown on the Drawings and as described in the Specifications. The work consists of the removal of the existing roadway material with full depth excavation, milling of the existing surface course, resurfacing of milled areas with hot mix asphalt, and the full reconstruction of roadway sections with DGA base course and hot mix asphalt pavement courses. The work is located along Grayrock Road, Fairview Avenue, Fulper Place, and Fulper Alley within the Township of Clinton and includes: site work, pavement construction, and general construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents