Similar Projects
Replace Roofing Systems
Bidding
Less than $400,000 est. value
Lerna, IL 62440

HVAC Upgrades
Renovation
Bidding
Chicago, IL 60605

Roofing Systems, Exterior Building Maintenance
Term Contract
Post-Bid

Roofing Systems, Exterior Building Maintenance
Term Contract
Post-Bid

2020 HVAC Replacement
Results
Wheeling, IL 60090

NEIU Replace Campus Roofs
Results
Less than $4,000,000 est. value
Chicago, IL 60625

South Pumping Station Roof Replacement
Bidding
Oak Park, IL 60304

FSCC Chiller Maintenance
Post-Bid
Chicago, IL 60608

Sports and Recreation Center HVAC Replacement
Results
De Kalb, IL 60115

Abingdon-Avon Middle School Roof Replacement
Bidding
Avon, IL 61415

Abb Hvac Drivers
Term Contract
Post-Bid
Chicago, IL 60612

Various Plumbing Improvements
Results
Winfield, IL 60190

Two Replacement A/C Rooftop Units
Renovation
Bidding
Naperville, IL 60540

Annual HVAC Maintenance Contract
Term Contract
Post-Bid
Lombard, IL

2020 TPPS Air Conditioning Units Replacement
Results
Tinley Park, IL 60451

Last Updated 03/25/2021 10:12 AM
Project Title

HVAC, Roof, and Door Replacement

Physical Address View project details and contacts
City, State (County) Marion, IL 62959   (Williamson County)
Category(s) Single Trades
Sub-Category(s) HVAC, Plumbing, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work under Base Bid to include partial demolition of existing HVAC equipment, unit ventilator system, roof assembly, ACT ceilings and light fixtures, surface mounted light fixtures, relocating of a variety of electrical and fire alarm items due to new ACT ceilings, and gypsum wall assemblies as required to install new mechanical ductwork, plumbing, and systems. Work under Base Bid to also include new roof top mechanical units on new roof curbs, new interior VAV mechanical units with associated ducting and plumbing, new boilers, new LED light fixtures, new ACT ceilings, new structural steel reinforcing, roof replacement, roof patching and infill, flashing of new roof penetrations, gas line extension and painting, exterior door and frame replacement, door hardware replacement, interior painting, VCT flooring, and brick masonry veneer and metal stud wall system infill. Corresponding structural, mechanical, electrical, and plumbing work will also be included. The project will be completed in 2 separate phases: Phase 1 - Summer 2021 and Phase 2 - Summer 2022. No exceptions.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 05 - Metals, Structural Steel Framing, Steel Decking, Metal Fabrications, Metal Stairs, Metal Ladders.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Sheathing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Flooring.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security, Access Control.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents