Similar Projects
Murphy USA #6608 / Stillwater
Demolition, New Construction, Infrastructure - 1,400 SF
Conception
$1,500,000 CJ est. value
Stillwater, OK 74074

2023 Bond - Stillwater Public Schools
New Construction, Renovation, Infrastructure
Conception
$195,000,000 CJ est. value
Stillwater, OK 74074

Grade, Drain, and Surface - US 177
Infrastructure
Design
$8,480,000 CJ est. value
Stillwater, OK 74074

Grade, Drain, and Surface - US 177
Infrastructure
Design
$8,480,000 CJ est. value
Stillwater, OK 74074

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SPS Sangre Ridge Elementary Classroom Renovation and SPS Middle School Playground Improvements
Renovation, Infrastructure
Bidding
$1,700,000 CJ est. value
Stillwater, OK 74074

Asphalt Repairs for OSUIT-Okmulgee
Infrastructure
Post-Bid
Stillwater, OK

Asphalt Overlay
Infrastructure
Post-Bid
$2,679,278 CJ est. value
Stillwater, OK 74074

Lake McMurtry Nature Learning Trail
Infrastructure
Results
Stillwater, OK

Slabjacking and Subsealing Services
Infrastructure
Results

Teal Ridge Estates Second Section
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Stillwater, OK 74074

Utilities - SH 51
Infrastructure
Design
$1,000,000 CJ est. value
Stillwater, OK 74074

South Thompson Avenue, Culvert Replacement Over Cottonwood Creek
Infrastructure
Post-Bid
$300,000 CJ est. value
Cushing, OK 74023

Cimarron/Creek Turnpike (AnET Conversion and Interchanges) Cimarron Turnpike, at the Interchanges on US-64, US-177, SH-99 and Cimarron Turnpike
Infrastructure
Results

Utilities - SH 18
Infrastructure
Design
$500,000 CJ est. value
Yale, OK 74085

Last Updated 03/18/2023 02:34 AM
Project Title

Resurface (Asphalt) - SH-51

Physical Address View project details and contacts
City, State (County) Stillwater, OK 74074   (Payne County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,717,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Resurface (Asphalt) Sh-51: From 0.18 Miles East of the Us-177 Junction, Extend East in Stillwater. Project Length = 2.870 Miles Counties: Payne Calendar Days : 150 Questions and comments will be accepted until Febraury 24, 2023. Submit Any Questions or Concerns to the Office Engineer Division via: - Email: Odot-prebid.question@odot.org - Phone: (405) 521 - 2625 Each Bid Shall Be Accompanied by a Certified or Cashier's Check or Bid Bond Equal to 5% of the Bid Made Payable to the State of Oklahoma, Department of Transportation, as a Proposal Guaranty. Proposal Checks Will Be Held or Returned by the Department as Per Subsection 103.04 of the State Standard Specifications. ODOT- Call Order 942 - Resurface (Asphalt) - SH-51

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents