Similar Projects
Ground Water Facility/Re-Pump Station/HVAC and Ventilation System Improvements at Various Locations - Package 2
Renovation, Alteration
Design
Houston, TX

Ground Water Facility/Re-Pump Station/HVAC and Ventilation System Improvements At Various Locations - Package 3
Renovation, Alteration
Design
Houston, TX

Maintenance Supplies, Equipment and Services
Term Contract
Bidding
Waller, TX

Heating, Ventilation and Air Conditioning (HVAC) System Replacement at the Cleveland Odom Clinic
Alteration
Bidding
$650,000 est. value
Houston, TX 77026

Heating, Ventilation, and Air Conditioning Services
Term Contract
Post-Bid
Houston, TX 77251

HVAC Bundle
Post-Bid
Baytown, TX

Duct Bank-William P. Hobby Airport
Results
Less than $100,000 est. value
Houston, TX 77061

HVAC Replacements for Coleman College
Term Contract
Results
$800,000 to $900,000 est. value
Houston, TX 77030

Pam Lychner (2) 12.5-Ton HVAC Units
Alteration
Bidding
Humble, TX 77396

Informal - Daikin Split Cool Units for BCT, BPT AND TBT
Post-Bid
Houston, TX

HVAC Condenser Leak Repair & Software Update
Results
Houston, TX 77034

Lopez Unit (2) 12.5-Ton HVAC Units
Alteration
Bidding
Humble, TX 77396

Bayport Facilitys First Step Blower Replacement Project
Post-Bid
Houston, TX

4110--NFS Walk-In Refrigeration
Results
Houston, TX 77030

HVAC and Mechanical Products
Term Contract
Post-Bid

Last Updated 04/29/2022 08:53 AM
Project Title

Modification of Ben Taub IR Suites Air Handling Unit and Associated Ductwork

Physical Address View project details and contacts
City, State (County) Houston, TX 77030   (Harris County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the vendor furnishing all personnel, labor, materials, equipment and incidentals necessary for the modification and upgrade AHU and reheat piping IR procedure rooms to increase airflow.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents