Similar Projects
Northeast Treatment Center Roof Replacement
Alteration
Bidding
$200,000 est. value
Wilmington, DE 19808

Middletown High School -Roof Replacement and HVAC Renovation
- 140,000 SF
Post-Bid
Middletown, DE 19709

Sojourner`s Place Roof Replacement
Renovation
Post-Bid
Wilmington, DE 19802

Greenhouse Roof Panel Replacement at Herman Holloway
Results
Less than $194,000 est. value
Minquadale, DE 19720

Roof Replacement Brandywine Water Treatment Plant
Results
Wilmington, DE 19801

Scannell RC Org Storage Building Roof Renovations
Alteration
Post-Bid
Delaware City, DE 19706

Cleveland White Building Roof Renovation
Results
Wilmington, DE 19805

Concord High School Partial Roof Replacement
Alteration
Post-Bid
Wilmington, DE 19810

District-Wide Roofing Repair Services
Term Contract
Results
Bear, DE

Christiana HS Humanities Wing - Roof Replacement
Alteration
Post-Bid
Newark, DE 19713

Christiana High School Humanities Wing - Roof Replacement
Results
Newark, DE 19713

Roof Coating at High-Rise and Mid-Rise Apartments
Alteration
Post-Bid
$400,000 est. value
Wilmington, DE

May B Leasure Elementary School - Roof Replacement
Results
Newark, DE

Porter State Service Center Roof Replacement
Alteration
Post-Bid
$200,000 est. value
Wilmington, DE 19801

Thurgood Marshall Elementary School - Roof Replacement
Results
Newark, DE 19702

Reported 06/17/2022 12:00 AM
Project Title

Leonard Williams/NCC Courthouse Roof Top Anchors

Physical Address View project details and contacts
City, State (County) Wilmington, DE 19801   (New Castle County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the following: Removing areas of existing roofing system down to the existing concrete deck to facilitate installation of vertical roof top anchors as shown and called for on the drawings. Remove areas of existing membrane and base flashing down to the surface of concrete curbs to facilitate installation of horizontal anchors shown and detailed on the drawings. Furnishing and installing 103+- total anchors for use by suspended maintenance work platforms, window washing scaffolding and rope descent systems. Patching and repairing existing roofing and flashing where disturbed by the anchors' installation utilizing approved roofing materials and methods matching the exiting roofing system. Remove and restore existing ceiling systems below the disturbed roof areas, as required to access the structure at anchor locations. Protecting mechanical and electrical items of equipment, wall finishes, floor finishes, computers, desks, and furnishings in all occupied areas where roofing and structural deck systems will be disturbed by installation of the roof topanchors. Cleaning up and removing construction debris and waste materialsfrom the roof and any occupied spaces on a daily basis.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents