Similar Projects
Pilot Lode Water Storage Tank Renovation
Renovation
Bidding
Keystone, CO

West Concrete Water Storage Tank
Post-Bid
Less than $2,250,000 est. value
Falcon, CO

COANG Fuel Storage Tank
Post-Bid
Aurora, CO 80011

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Z--Bgndrf Glass Fused to Steel Storage Tanks Maintenance and Repairs
Post-Bid

Upper Water Storage Tank Rehabilitation Project
Results
Del Norte, CO

Water Treatment Process Tank and Apparatus Repair
Post-Bid
Arvada, CO

1 Million Gallon Water Storage Tank
Results
Less than $4,630,916 est. value
Steamboat Springs, CO 80477

ERWSD & UERWA Water Storage Tank and Booster Pump Stations Hatch Improvements
Post-Bid
Vail, CO

Liquid De-Icer Storage Tanks
Results
Arvada, CO 80002

On Call Tank and Monitoring Services
Post-Bid
CO

0.5 MG East Barclay Tank Rehabilitation Project
Results
Craig, CO 81625

0.2 MG Tank Rehabilitation
Alteration
Post-Bid
Mountain Village, CO

Widefield Terminal Tank Rehabilitation
Results
Colorado Springs, CO 80947

Last Updated 10/04/2021 02:41 PM
Project Title

Y--Zion-New Water System at Kolob Canyons

Physical Address View project details and contacts
City, State (County) Denver, CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to replace portions of the existing water storage tank system at the Kolob Canyons Visitor Center at Zion National Park in Utah. The work will consist of demolition and removal of an existing underground 12,000 gallon fiberglass storage tank, well pumping equipment and chlorination equipment, and replacing with a new 50,000-gallon Cast-in-Place concrete water storage tank and associated equipment well pump and equipment, yard piping and associated appurtenances. Work includes construction of bollards, asphalt patching, construction of new water mains and service lines, installation of new tank controls, water treatment piping, electrical conduit and wiring, and chemical feed pump. Site work will include trenching, backfilling, native soil replacement, mulching and seeding (revegetation) of all areas along the path of the new water mainline in order.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents