Similar Projects
Resurfacing and Related Work on a Section of Route 2 (Mohawk Trail)
Infrastructure
Bidding
$5,222,245 est. value
Clarksburg, Florida, North Adams, MA 01247

Replace Select Pipe Culverts on East and West Street to Improve Drainage
Infrastructure
Bidding
$235,000 est. value
Mount Washington, MA 01258

Road Crack Sealing
Term Contract
Post-Bid
Pittsfield, MA

Road Crack Purchase and Service for Various Participating Towns
Term Contract
Post-Bid
$430,000 est. value
Pittsfield, MA

Scheduled and Emergency HMA Pavement and Paved Waterway Repairs at Various Locations
Results
Less than $180,000 est. value

Scheduled and Emergency Roadway Repairs and Related Work (Including Slope Stabilization) at Various Locations
Results
Less than $675,000 est. value

Pavement Mill and Overlay and Pavement Reclaim and Repave Overlay
Infrastructure
Bidding
$2,365,000 est. value
Pittsfield, MA

Cold Patch
Infrastructure
Post-Bid
Pittsfield, MA

Resurfacing and Related Work at Various Locations
Results
Less than $956,888 est. value

Stone Seal
Infrastructure
Bidding
$112,325 est. value
Pittsfield, MA

McGee Road and Warner Road Paving
Infrastructure
Post-Bid
Less than $92,000 est. value
Egremont, MA 01230

Resurfacing and Related Work on A Section of Interstate 90
Results
Less than $11,266,676 est. value
Becket, Otis, MA

Road Crack Sealing
Infrastructure
Bidding
$1,888,880 est. value
Pittsfield, MA

FY21 Paving
Infrastructure
Post-Bid
$213,600 est. value
Florida, MA 01247

Resurfacing and Related Work on Interstate 90
Results
$11,720,854 est. value
Lee, MA

Last Updated 06/01/2022 10:08 AM
Project Title

Mill and Overlay Resurfacing

Physical Address View project details and contacts
City, State (County) North Adams, MA   (Berkshire County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Required. Mill and overlay resurfacing with new cement concrete sidewalks with integral cement concrete curb, ADA/MAAB compliant curb ramps and crosswalks, traffic signs, replacement of frames and grates or frames and covers as needed, and all associated work for the entire lengths of Bracewell Avenue (approx. 1,830 LF) and Freeman Avenue (approx. 234 LF)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents