Similar Projects
Bldg 200 Repair by Replacement Boiler and Controls and Repair Air Compressor Exhaust
Infrastructure
Design
$1,000,000 to $2,000,000 est. value
Fort McCoy, WI

Building One And Four Air Conditioning Installation GPC
Infrastructure, Alteration
Bidding
$1,247,800 est. value
Madison, WI 53704

Environmental Health and Safety Central Utility Connections - MEP
Alteration
Bidding
$1,350,000 est. value
Madison, WI 53715

Vendor Service Contract for Essential/Emergency HVAC Services
Term Contract
Post-Bid
Milwaukee, WI 53202

Ionization System Installation
Post-Bid
Lancaster, WI 53813

Training Kitchen Fire Suppression and Exhaust Replacement
Results
Less than $232,000 est. value
Oshkosh, WI 54901

Liebert Air Conditioning Unit for Sheriff's Office Communications
Results
Elkhorn, WI 53121

Building One And Four Air Conditioning Installation MEP
Infrastructure
Bidding
Madison, WI 53704

HVAC, Hot Water Heaters & Refrigerators
Term Contract
Post-Bid

WITC - Rice Lake Campus Heat Pumps
Results
Rice Lake, WI 54868

Engineering Services - Hvac System Improvements In Buildings 378 And 380 At South Shore Water Reclamation Facility
Term Contract, Alteration
Bidding
Milwaukee, WI

HVAC Hot Water Heaters and Refrigerators Installment
Term Contract
Post-Bid

Northeast Wisconsin Technical College Fan Wall Upgrade
Results
Green Bay, WI 54303

Dewey Water Distribution Building HVAC Upgrade
Infrastructure
Bidding
Manitowoc, WI 54220

Emergency Furnace Replacement
Term Contract
Post-Bid

Last Updated 02/17/2022 03:26 PM
Project Title

Transportation Center Make Up Air Unit Replacement

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54307   (Brown County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located at Northeast Wisconsin Technical College in Green Bay, Wisconsin. The scope of work includes the removal of an existing direct fired make-up air unit and the installation of a new in-direct fired make-up air unit with additional supply ductwork & revised controls. Work includes HVAC, fire protection, and electrical. Work on this project will consist of a single lump sum contract for all work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents