Similar Projects
Applied Energy Services Adair County Solar Farm
New Construction, Infrastructure
Conception
$332,000,000 CJ est. value
Kirksville, MO 63501

Hyde Park Restroom - 319615 - City of St.Joseph
New Construction, Infrastructure
Conception
$482,820 CJ est. value
Saint Joseph, MO 64504

Park Shelter for More's Lake at the City of Columbia Municipal Power Plant
Infrastructure
Design
$100,000 CJ est. value
Columbia, MO 65201

SOFTBALL FIELD ARTIFICIAL PLAYING SURFACE AND FENCING
Infrastructure
Design
$300,000 CJ est. value
Kirksville, MO 63501

EquipmentShare Technology Development Center
New Construction, Infrastructure - 36,256 SF
Bidding
$6,000,000 CJ est. value
Columbia, MO 65201

NextGen Precision Health Building - Level 4 - Shell Space Fitout
Addition, Demolition, Renovation, Infrastructure - 18,200 SF
Bidding
$12,290,360 CJ est. value
Columbia, MO 65212

Submersible Pump - Maryland Heights Pump Station
Infrastructure
Post-Bid
Columbia, MO

Cross Country Track Dirt Work
Infrastructure
Post-Bid
Saint Joseph, MO 64507

Rough Site Grading, Parking and Storm Water System Installation
Infrastructure
Results
Columbia, MO

Submersible Pumps - Deer Ridge Pump Station
New Construction
Results
Columbia, MO 65203

Rolling Hills Library Savannah Branch Parking Lot & Retaining Wall
Infrastructure
Construction
$324,000 CJ est. value
Savannah, MO 64485

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

Providence South Plaza
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Columbia, MO 65201

Northside Complex Splash Park - 250696 - City of Saint Joseph
Infrastructure
Conception
$2,000,000 CJ est. value
Saint Joseph, MO 64501

Forum Boulevard - Green Meadows to Nifong - 00653 - City of Columbia
Infrastructure
Design
$2,250,000 CJ est. value
Columbia, MO 65203

Last Updated 02/20/2023 07:36 AM
Project Title

Northeast Lift Station Rehabilitation - City of Kirksville

Physical Address View project details and contacts
City, State (County) Kirksville, MO 63501   (Adair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $2,133,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined This project is in included in the City of Kirksville FY 2023-2027 Capital Improvement Plan (CIP). As of February 20, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents