Similar Projects
2022 Quaker Valley Culvert Reconstruction Project
Infrastructure
Design
Farmington Hills, MI

2022 Retaining Wall Repair Program
Infrastructure
Bidding
$600,000 est. value
Bloomfield Township, MI

Lone Pine Road Retaining Wall Replacement Project
Infrastructure
Bidding
$300,000 est. value
West Bloomfield, MI 48323

Rochester High School Storm Drainage Projects
Post-Bid
Rochester Hills, MI 48309

Mercer Beach Improvements Phase 1
Infrastructure
Post-Bid
Walled Lake, MI

11 Mile Road over Novi-Lyon Drain Culvert Replacement
Results
Beverly Hills, MI

Corrugated Metal Pipe, Bands, And Bolts
Results
Beverly Hills, MI

Lahser Road Drainage Repairs
Infrastructure
Post-Bid
Beverly Hills, MI 48025

Union Lake Road Over Hayes Drain
Results
Less than $970,000 est. value
Beverly Hills, MI

Corrugated Metal Pipe, Bands, and Bolts
Infrastructure
Post-Bid
Beverly Hills, MI

Beach Erosion Control at Camp Dearborn
Results
Milford, MI 48380

Drainage System Cleaning - Oakland TSC(Transportation Service Center)
Infrastructure
Post-Bid
Pontiac, MI 48341

Milford Road over Buckhorn Creek
Results
Beverly Hills, MI

12 Mile Road Culvert Replacement
Infrastructure
Post-Bid
$500,000 est. value
Pontiac, MI

Drainage Structure Repairs and Concrete Curb And Gutter
Results
MI

Reported 06/22/2022 01:01 PM
Project Title

Streambank Stabilization - Middle Rouge River (Near Meadowbrook Lake) - 133-08

Physical Address View project details and contacts
City, State (County) Novi, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value $1,469,656 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

he 2014 Storm Water Master Plan identified an area along the Middle Branch of Rouge River downstream of Meadowbrook Lake, where severe bank erosion was present (site 26). This project will repair and protect the streambank from future erosion. As of June 21, 2022, this project is currently in the City of Novi FY 2022-2028 CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents