Similar Projects
The Sand Trace Phases 1, 2 and 3
New Construction, Infrastructure
Conception
$113,200,000 CJ est. value
Smithfield, RI 02917

Central Street Development
New Construction, Infrastructure
Conception
$4,000,000 CJ est. value
Central Falls, RI 02863

Salve Regina University Dormitory
Demolition, New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Newport, RI 02840

Community Music Works
New Construction, Infrastructure - 11,033 SF
Design
$5,000,000 CJ est. value
Providence, RI 02909

Woodsprings Suites - Post Road / Warwick
New Construction, Infrastructure
Bidding
$30,400,000 CJ est. value
Warwick, RI 02886

RFQ Contractor - Bulkhead Repairs S366 and Pier 1 Naval Station Newport
Infrastructure
Bidding
$25,000,000 CJ est. value
Newport, RI 02841

AutoZone #3648 / Warren - Rebid
New Construction, Infrastructure - 7,147 SF
Post-Bid
$1,900,000 CJ est. value
Warren, RI 02885

CSO Phase III A-9 GSI Projects
Infrastructure
Post-Bid
Central Falls, RI 02863

Land Clearing and Grubbing
Infrastructure
Results
Tiverton, RI

Site Improvements at Goldsmith Manor
Infrastructure
Results
East Providence, RI 02914

Rogers High School Replacement Project - City of Newport
New Construction, Infrastructure - 166,875 SF
Construction
$108,000,000 CJ est. value
Newport, RI 02840

Mavis Street / Townhomes
New Construction, Infrastructure
Construction
$4,020,000 CJ est. value
Pawtucket, RI 02860

Post Road Contractor Storage Building
New Construction, Infrastructure
Pending Verification
$7,600,000 CJ est. value
Warwick, RI 02888

New Pond Park - City Of Cumberland
Infrastructure
Pending Verification
$40,000,000 CJ est. value
Cumberland, RI 02864

Briarwood Estates / Cranston
New Construction, Infrastructure
Conception
$4,000,000 CJ est. value
Cranston, RI 02910

Last Updated 06/23/2023 04:11 PM
Project Title

Lower and Upper Kickemuit Dam Removals

Physical Address View project details and contacts
City, State (County) Warren, RI 02885   (Bristol County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Bristol County Water Authority (BCWA) is seeking sealed Bids for the Lower and Upper Kickemuit Reservoir Dam Removal project. The work under this contract includes but is not limited to the following: Lower Kickemuit Dam Removal: The installation of control of water devices and by-pass pipes; dredging, dewatering, and disposing of impacted sediments; breaching of the dam; concrete demolition; multiple phases of mobilization, collection, and dewatering of non-impacted sediments; disposal of non-impacted sediments; riprap installation; grading; ecological restorations; plantings; and the installation of tide gates to existing headwalls along Serpentine Road. Upper Kickemuit Dam Removal: The installation of control of water devices; breaching of the dam; concrete demolition; multiple phases of mobilization, collection, and dewatering of non-impacted sediments; disposal of non-impacted sediments; riprap installation; grading; plantings; ecological restorations; pipe/outlet abandonment; and the placement of loam and seed. Upper Kickemuit Dam Removal - Mobilize to the project site; establish site access roadways, staging areas, and entrance mats; remove and store site features conflicting with construction access and proposed for resetting. - Install erosion and sediment controls. - Clear vegetation as required to complete the work. - Install upstream and downstream coffer dams upstream and downstream of the Upper Kickemuit Reservoir Dam. Divert flow through the low-level outlet located near station 1+10. - Demolish spillway structures and excavate the breach to the proposed limits. - Remove upstream and downstream cofferdams in stages to mobilize sediment. - Remove sediment as required and to the limits specified. - Stockpile the removed sediment in the dewatering areas and dispose of the sediment at a disposal facility after remova - Perform final grading along the side slopes of the breach. - Abandon the outlet pipes through the dam and plug and fill the remaining portion of pipe with concrete. - Plant vegetation and install boulders along the breach channel. - Remove remaining portions of the cofferdams. - Loam and seed the work area, staging areas, and all other areas disturbed by construction activities. - Restore all disturbed areas of the site including the removal of all sediment and erosion controls after vegetation has been established. - Return the staging area to the pre-construction condition and demobilize from the site.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents