Similar Projects
Polk-Quincy - 701048.0 - City of Topeka
Infrastructure
Conception
$7,000,000 est. value
Topeka, KS

South Kansas Avenue(4th to 6th Avenue) - 841095 - City of Topeka
Alteration
Conception
$892,045 est. value
Topeka, KS 66630

BRVB - Pavement Resurfacing and ADA Improvements
Infrastructure
Design
$25,000 to $100,000 est. value
Topeka, KS 66612

Milling and HMA Overlay
Infrastructure
Bidding
$800,000 est. value
Hays, Topeka, KS 66614

Street Improvement Project
Infrastructure
Bidding
$5,000,000 est. value
Topeka, KS

14th Street Improvements
Infrastructure
Post-Bid
Auburn, KS

South Topeka Blvd BNSF Rail Crossing Removal & Pavement Replacement
Infrastructure
Post-Bid
Topeka, KS

Micro-Surfacing 2021
Infrastructure
Results
Topeka, KS

2021 City Wide Temporary Cap Replacement
Infrastructure, Alteration
Results
Topeka, KS

South Topeka Boulevard from 15th to 21st - 701045 - City of Topeka
Infrastructure
Conception
$4,700,000 est. value
Topeka, KS 66630

Repairs and Striping at the Detention Facilities
Infrastructure
Bidding
$60,000 est. value
KS

Fire Stations Paving Repairs
Infrastructure
Post-Bid
$200,000 est. value
Topeka, KS

City Street Repair
Infrastructure
Results
Topeka, KS

S. Topeka Blvd from 29th Street to 37th Street - 701038
Alteration
Conception
$2,343,290 est. value
Topeka, KS 66612

Street Improvement Project
Infrastructure
Bidding
$500,000 est. value
Topeka, KS 66604

Last Updated 07/13/2022 01:35 PM
Project Title

SW 29th Street from Topeka Blvd to Burlingame Road

Physical Address View project details and contacts
City, State (County) Topeka, KS 66612   (Shawnee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected September 2025
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves curb replacement, localized base patching, and mill/overlay. The design is scheduled for 2023 with construction planned for 2025. Coordination with Water Pollution Control is needed. The construction is delayed until 2025 to avoid conflicts with improvements planned for Topeka Blvd. As of July 12, 2022, this project is currently in the FY 2023-2032 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents