Last Updated | 09/09/2022 11:01 PM |
Project Title | School Nutrition Test Kitchen |
Physical Address | View project details and contacts |
City, State (County) | Canton, GA 30115 (Cherokee County) |
Category(s) | Commercial, Heavy and Highway |
Sub-Category(s) | Food/Beverage Service, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,156,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To provide GC services for the construction (site, building, and systems) of the Owners Construction of the Project as specified per the Proposal Documents. The requirements for this Project, and the duties and responsibilities of the GC whose Proposal is accepted, are outlined in the Contract Documents which include the Instructions to Proposers; Contract for Construction and Incorporated General Conditions (the Contract); supplementary and other conditions; the drawings; the specifications; and any addenda issued by the Architect. The Contract Documents require, among other things, the furnishing of all materials, labor, and equipment for the construction of the Project. The Owner reserves the right to make available other relevant documents or information concerning the Project. To provide GC services for the construction (site, building, and systems) of the Owner's Construction of the Project as specified per the Proposal Documents. The requirements for this Project, and the duties and responsibilities of the GC whose Proposal is accepted, are outlined in the Contract Documents which include the Instructions to Proposers; Contract for Construction and Incorporated General Conditions (the "Contract"); supplementary and other conditions; the drawings; the specifications; and any addenda issued by the Architect. The Contract Documents require, among other things, the furnishing of all materials, labor, and equipment for the construction of the Project. The Owner reserves the right to make available other relevant documents or information concerning the Project. Final Questions Due August 16, 2022, not later than 2:00 p.m. Final Addendum Issued (if necessary) August 18, 2022, not later than 2:00 p.m. Any Proposal submitted in response to this RFP should strictly comply with all requirements outlined in the Instructions to Proposers - Section 002116. Any such Proposal must contain the completed Proposal Form - Section 004213 setting forth the GC's proposed lump sum contract price for the full and complete construction of the Project in conformity with all requirements of the Contract Documents. Any Proposal must include a fully executed Bid Bond - Section 004313 in the amount of five percent (5%) of the proposed lump sum contract price (exclusive of any alternates and unit prices) in the exact form referenced. As noted above, any contractor submitting a Proposal must also complete and submit the required General Contractors Checklist and Certification - Section 002118.30, along with all referenced Owner's Standard Forms. For any work requiring a specialty or professional license, only licensed subcontractors may be submitted for consideration. In evaluating Proposals, the Owner may seek additional information from any Contractor concerning such GC's Proposal to construct the Project. Additionally, the Owner at its discretion, and in conformity with the applicable provisions of Georgia Law, the Owner may afford GCs an opportunity for subsequent discussion, negotiation, and revision of Proposals. The Owner reserves the right to reject any Proposals and to waive technicalities and informalities. The Owner intends to award the Contract to the responsible and responsive GC whose Proposal is determined in writing to be the most advantageous to the Owner, taking into consideration the following evaluation factors which are outlined in the Instructions to Proposers, Item P - Contract Award. Except as expressly provided in, or permitted by, the Proposal Documents, from the date of issuance of the RFP until the final Board action of approval of Contract Award, the GC submitting a Proposal shall not initiate any communication or discussion concerning the Project, the RFP or the GC's Proposal or any part thereof with any employee, agent, or representative of the Owner. Any violation of this restriction may result in the rejection of the GC's Proposal. Intent to Bid Due Date: Aug 23rd 2022, 9:00 AM EDT Questions Due Date: Aug 16th 2022, 2:00 PM EDT |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |