Similar Projects
Col/Wynne Russell-West Johns Sidewalk
Post-Bid
Lilburn, GA

Bona Road Sidewalk Improvements
Post-Bid
Buford, GA 30518

West Jones Bridge Pedestrian Crossing
Results
Peachtree Corners, GA 30092

Jimmy Carter Boulevard Pedestrian Improvement Project
Results
Lawrenceville, GA 30046

Gunnin Road Sidewalks
Post-Bid
Peachtree Corners, GA 30092

Downtown Norcross Compactor Enclosure Construction
Results
Norcross, GA 30071

Dacula City Hall Ada Upgrades
Post-Bid
Dacula, GA 30019

Peachtree Industrial Boulevard (from Winters Chapel Road to Peachtree Corners Circle) Pedestrian Improvement Project
Results
Lawrenceville, GA 30042

Paper Mill Road Sidewalk Improvements Project
Post-Bid
Lawrenceville, GA 30246

Annex Building Parking Lot Improvement Project
Results
Lawrenceville, GA 30043

Robin Ridge Drive, Joey Court, and Tecca Court Asphalt Paving Improvements/Sidewalk Project
Post-Bid
Dacula, GA 30019

SR13 Left Turn Lane Extension
Results
Less than $102,621 est. value
Buford, GA 30515

Provision of Parking Lot and Asphalt Trail Maintenance and Repair on an Annual Contract
Term Contract, Infrastructure
Post-Bid
GA

Clayton Street at Nash Street Parking Lot Project
Results
Less than $382,757 est. value
Lawrenceville, GA 30046

Destination Park Improvements
New Construction, Infrastructure
Post-Bid
Loganville, GA 30052

Last Updated 07/30/2021 10:28 AM
Project Title

SR120 / Duluth Highway

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA 30246   (Gwinnett County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SR120 / Duluth Highway (from near Colony Bend Drive to Riverside Parkway) & SR20 / Grayson Highway (from Crane Drive to near Park Place Drive) Pedestrian Improvement Project These two Pedestrian Improvement projects/contracts consist of 0.220 miles of installation of sidewalk on SR120 / Duluth Hwy and 0.417 miles of installation of sidewalk on SR20 / Grayson Hwy. •Earthwork Less than 2,500 CY•Curb & Gutter 756 LF•Concrete Flat Work 1,982 SY•Asphalt 120 TN•Concrete Structures 3 CY

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents