Similar Projects
Last Updated | 06/01/2023 04:31 AM |
Project Title | Epoxy Paint Striping Billings Area |
Physical Address | View project details and contacts |
City, State (County) | Billings, MT 59101 (Yellowstone County) |
Category(s) | Single Trades |
Sub-Category(s) | Painting |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $330,240 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Montana Department of Transportation (MDT) is accepting bids for Epoxy Paint Striping Billings Area. Additional details regarding the solicitation can be viewed by logging into eMACS and reviewing the requirements of this solicitation. Questions or information relating to either specifications or requirements of this solicitation must be asked through the eMACS Q&A Board. Potential bidders must log into eMACS to submit a question on the Q&A Board. For general assistance with eMACS contact the eMACS Help Desk at emacs@mt.gov or (406) 444-2575. For assistance with vendor registration or responding to events please refer to the eMACS Resources website. Be sure to certify and submit your response once completed. Question Submission Close Date 4/20/2023 2:00 PM MDT WORK CANNOT BEGIN UNTIL AFTER: JULY 1, 2023 WORK IS REQUIRED TO BE COMPLETED ON OR BEFORE: AUGUST 25, 2023 Contractor will provide all labor, materials, equipment, traffic control and incidentals necessary to apply epoxy pavement markings per contract information. Contractor shall replace the existing stripes in kind unless otherwise directed by the Maintenance Chief. If current words and/or symbols have shadowing, the shadowing must be completely removed and replaced with words and or symbols that conform to current detailed drawings. Shadowing is defined as a word/ and or symbol having multiple visible letter(s) from previous applications. Removal will be by heavy grind or by a method approved in writing by the Maintenance Chief or their designee. Acceptance of any words and/or symbols that do not conform to current detailed drawings must be approved in advance, in writing by the Maintenance Chief or their designee |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |