Similar Projects
Reported | 03/25/2020 12:00 AM |
Project Title | Connect B1 W Penthouse to Central Chiller Plant |
Physical Address | View project details and contacts |
City, State (County) | Marion, IL 62959 (Williamson County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project provide a Chilled Water Plant source of chilled water to the air handling unit (AHU) 3 located on the rooftop of Building 1 (B1) west. This work will require the extension of two - 4” copper lines located in the ceiling space of room 345E into the mechanical penthouse on the rooftop of B1 and the connection of these extended lines to the 3” piping currently in place on the AHU. The rooftop chillers currently serving the referenced AHU will be decommissioned and removed. Additionally, all structure, pipework and equipment supporting the current chilled water system will be decommissioned and removed. The contractor shall ensure that affected spaces are returned to a suitable state of weather and structural soundness. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |