Similar Projects
Update HVAC Controls
Bidding
Less than $1,500,000 est. value
Springfield, IL 62702

MVCC Building H Natatorium RTU Replacement
Bidding
Tinley Park, IL

N041--25 Ton Chiller Replacement
Post-Bid
North Chicago, IL

J041--Marion VA Medical Center Annual York Chiller Inspection and Preventive Maintenance
Post-Bid
Marion, IL

DOC-Sheridan-Outdoor Chiller for C3
Results
Sheridan, IL 60551

2020 HVAC Replacement
Results
Wheeling, IL 60090

2021 HVAC Improvements
Renovation
Bidding
Washington, IL 61571

Furnace Inspection & Cleaning at Various Sites
Term Contract
Post-Bid
Evanston, Wheeling, IL

Replace Chiller
Results
$1,000,000 to $1,400,000 est. value
Elgin, IL 60123

HVAC Air Filters- District Wide
Term Contract
Bidding
Algonquin, IL

HVAC Maintenance
Term Contract
Post-Bid
Mount Prospect, IL 60056

Upgrade HVAC / Plumbing Systems Phase I
Renovation
Results
$2,500,000 to $5,000,000 est. value
Charleston, IL 61920

Fairfield HS Gym HVAC Replacement
Bidding
Fairfield, IL 62837

Replace Fire Doors And Air Handler Units
Post-Bid
Less than $150,000 est. value
Ina, IL 62846

HVAC Maintenance
Term Contract
Results
Riverdale, IL 60827

Reported 03/25/2020 12:00 AM
Project Title

Connect B1 W Penthouse to Central Chiller Plant

Physical Address View project details and contacts
City, State (County) Marion, IL 62959   (Williamson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project provide a Chilled Water Plant source of chilled water to the air handling unit (AHU) 3 located on the rooftop of Building 1 (B1) west. This work will require the extension of two - 4” copper lines located in the ceiling space of room 345E into the mechanical penthouse on the rooftop of B1 and the connection of these extended lines to the 3” piping currently in place on the AHU. The rooftop chillers currently serving the referenced AHU will be decommissioned and removed. Additionally, all structure, pipework and equipment supporting the current chilled water system will be decommissioned and removed. The contractor shall ensure that affected spaces are returned to a suitable state of weather and structural soundness.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents