Similar Projects
Rehabilitation Taxiway B North - City of Billings
Infrastructure
Conception
$1,320,000 CJ est. value
Billings, MT 59105

Public Ramp - Northside Expansion - Phase 2 - City of Billings
Demolition, Infrastructure
Conception
$1,750,000 CJ est. value
Billings, MT 59105

Saint Charles Mission School Parking Lot Reconstruction and Drain Field Replacement
Infrastructure
Design
$570,000 CJ est. value
Billings, MT 59101

Coca-Cola Bottling Companies New Facility / Billings
New Construction, Infrastructure
Design
$23,700,000 CJ est. value
Billings, MT 59101

West End Water Intake and Pump Station
New Construction, Infrastructure
Bidding
$12,000,000 CJ est. value
Billings, MT 59101

I-94 Br Pres
Infrastructure
Bidding
$6,000,000 CJ est. value
Custer, MT 59024

West Taxilane Extension
Infrastructure
Post-Bid
$100,000 CJ est. value
Billings, MT 59105

SARC No-Till Plot Seed Drill
Infrastructure
Post-Bid
Huntley, MT 59037

Underpass Ave - Billings
Infrastructure
Results
$9,975,733 CJ est. value
Billings, MT 59101

Riverfront Park Trail - City of Billings
Infrastructure
Conception
$1,350,000 CJ est. value
Billings, MT 59101

Coca-Cola Fleet Shop / Billings
New Construction, Infrastructure
Design
$2,088,970 CJ est. value
Billings, MT 59101

Castle Rock Park Playground Development
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Billings, MT 59105

Trail Connector from Trail Segment South of King Avenue West to TransTech Center - City of Billings
Infrastructure
Conception
$600,000 CJ est. value
Billings, MT 59101

Pompeys Pillar National Monument Stabilization
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Pompeys Pillar, MT 59064

Stagecoach Trail (Rim rock Road to Highway 3) - City of Billings
Infrastructure
Conception
$3,150,000 CJ est. value
Billings, MT 59102

Last Updated 10/04/2022 09:08 AM
Project Title

Shop World 3 Subdivision

Physical Address View project details and contacts
City, State (County) Billings, MT 59106   (Yellowstone County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 4, 2022, this project is under review with Yellowstone County Planning. Although there is not a firm timeline, construction could begin in first quarter 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents