Similar Projects
EHA La Posada Apartments
Renovation
Bidding
$4,900,000 CJ est. value
Edinburg, TX 78539

South Thompson Avenue Paving and Drainage Improvements
Infrastructure
Bidding
$1,200,000 CJ est. value
Tyler, TX 75702

Ready Mix Concrete
Term Contract
Post-Bid
Corpus Christi, TX

Purchase and Delivery of Concrete Poles for Rodgers to Rayburn Transmission Line
Term Contract
Post-Bid
Bryan, TX

Bulkhead Repairs - Town of Bayside
Results
$205,128 est. value
Bayside, TX 78340

General Concrete Work
Term Contract
Results
San Antonio, TX

Dyess Single-Mode Fiber Expansion Project
Infrastructure
Bidding
$400,000 CJ est. value
Abilene, TX 79601

SH0495 - Sand
Alteration
Post-Bid
$15,015 est. value
TX

Concrete
Results
TX

Construction of Paving Facilities
Infrastructure
Bidding
$200,000 CJ est. value
Texas City, TX 77590

Precast Modular Blocks
Term Contract
Post-Bid
Fort Worth, TX

Annual Contract for Utility Concrete Repairs (Area 1)
Results
Mesquite, TX

Volumetric Batch Mixed Onsite Concrete
Alteration
Post-Bid
Arlington, TX

Outdoor Fitness Equipment Concrete Slab
Results
Galveston, TX

Trench Drain Concrete Repair Project
Alteration
Post-Bid
TX

Last Updated 10/21/2022 12:33 AM
Project Title

Construction of Raw Water Chemical Feed Improvements

Physical Address View project details and contacts
City, State (County) Brownwood, TX 76801   (Brown County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $780,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Raw Water Chemical Feed Improvements. The Brown County Water Improvement District No. 1 is requesting bids for the Construction of Raw Water Chemical Feed Improvements. Advertisement and bidding information for the Project can be found at the procurement electronically. Construction of chemical storage and feed facilities for zebra mussel control. Work includes the following: 1. Bulk chemical storage and concrete containment area, 2. Precast concrete building to house chemical feed room and electrical room, 3. Chemical feed system including wall-mounted chemical feed skid, 4. Site work including grading, paving, fencing and gates, and yard piping, 5. Modifications to the existing raw water intake structure, 6. Chemical injection at the raw water intake at Lake Brownwood, and 7. All related electrical and instrumentation work including site lighting. Please direct all questions related to the design of this Project to the Q&A Section. The deadline to ask questions is 10/17/2022 12:00 PM CST Estimate: $800,000.00 - $900,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Owners Budget for the Project is $780,000. The Project is to be substantially complete and ready for operation on or before 270 calendar days after Notice to Proceed. The Project is to be complete and eligible for final payment 60 calendar days after the date for Substantial Completion. pre bid meeting info Microsoft Teams meeting Join on your computer, mobile app or room device Click here to join the meeting Meeting ID: 240 760 336 188 Passcode: NeaxRa Download Teams | Join on the web Or call in (audio only) +1 469-206-8447,,830603960# United States, Dallas (866) 606-1179,,830603960# United States (Toll-free) Phone Conference ID: 830 603 960# Find a local number | Reset PIN Learn More | Meeting options

Details

2 Stories Above Grade, 15,500 SF.
Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents